Retrospective planning permission in London

Retrospective planning permission is an application made after the work has been built. It is a normal application, judged on the same planning merits as any other, and for building works completed under the current rule the council can still take enforcement action for ten years from substantial completion. Here is how the process runs and what it costs.

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

What retrospective means in practice

Nothing about the form changes. You complete the same application the council would have asked for beforehand, and you describe the development as built. The council weighs it on the planning merits, as it would an application made beforehand.

What does change is the evidence. You need drawings of the building as it now exists, because the council will compare them with what was approved, if anything was. Our measured building survey captures the as-built dimensions, and the guide to what happens if you build without planning permission covers what the council may do while you prepare.

The ten-year rule for building works

Under section 171B of the Town and Country Planning Act 1990, as substituted by the Levelling-up and Regeneration Act 2023 from 25 April 2024, no enforcement action may be taken after ten years beginning with the date of substantial completion of building operations in England. The Act is on legislation.gov.uk.

That is a limit on enforcement, not a grant of permission. It covers building operations. Works substantially completed before 25 April 2024 may fall under the rule that applied before that date, so check the completion date before relying on either period. A change of use follows its own rules, so do not assume the same period covers it. Our planning enforcement guide explains the notices a council can serve.

Victorian terrace with bay windows and cars parked along the street
Flat-fronted stock brick terrace with brightly painted front doors

Councils in England refused 13,902 householder applications in the four quarters from 2025 Q3 to 2026 Q2 (our analysis of MHCLG planning application statistics, table PS2).

Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk

Fee and timing

A householder application for alterations or extensions to a single dwellinghouse carries a statutory fee of £548 from 1 April 2026 (SI 2012/2920, Schedule 1, Part 2, category 6(1)). That is paid to the council.

The council's decision period for an application that is not major development is 8 weeks, beginning the day after it receives the application (DMPO 2015, article 34(2)(b)). Our guide on how long planning permission takes explains how the clock and any agreed extension work.

What the national figures say about refusals

Councils in England refused 13,902 householder applications in the four quarters from 2025 Q3 to 2026 Q2 (our analysis of MHCLG planning application statistics, table PS2). A refusal is not the end of the road: you can appeal.

Of 26,568 householder appeals decided in England between 2021 and 2026, 36% were allowed (our analysis of the Planning Inspectorate Casework Database). Each case turns on its own facts, and these figures describe the past, not your site. Our planning appeal process guide lays out the steps.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Getting the drawings ready

We measure the property and draw the as-built floor plans, elevations and sections, then prepare the application set. See our planning drawings service for what is included, or the pricing page for fixed fees.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
ten yearsTown and Country Planning Act 1990 s171B(1) (England, as substituted by the Levelling-up and Regeneration Act 2023 from 25 April 2024): no enforcement action after ten years beginning with substantial completion of operations (source wording: ten years)www.legislation.gov.uk
£548Statutory fee from 1 April 2026, SI 2012/2920 Sch 1 Pt 2 category 6(1): householder application for alterations or extensions to a single dwellinghouseassets.publishing.service.gov.uk
8 weeksDMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: 8 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
13,902Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
26,568Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
36%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
FAQ

Questions people ask

Can I apply for planning permission after building?
Yes, in most cases. The council decides an application for work already carried out on its planning merits, as it would any other.
Is retrospective planning permission harder to get?
The test is the same, but the council can see the finished result, so the discussion is about the actual impact on neighbours and the street rather than a drawing alone.
What if my extension is more than ten years old?
For most building works, the enforcement period in section 171B can have expired. If you want it confirmed on the record, a lawful development certificate is the route to discuss with us.
Do I need new drawings?
Yes. The council needs accurate drawings of what has been built. If none exist, a survey is the starting point.