Building Regulations Drawings in Totteridge N20
Fixed-fee, MCIAT-chartered building regulations drawings for Totteridge (N20) homeowners — London Borough of Barnet validation and local constraints handled from the start.
Totteridge (N20) runs along a green ridge of large detached houses, former farmhouses and villas on deep plots with paddocks and mature trees, and that semi-rural grain shapes the generous but carefully judged extensions we draw here.
Because the conservation area has carried Article 4 directions since 1970 that remove PD rights for extensions, roofs, porches and outbuildings, we check the boundary and any Green Belt overlap before advising whether a scheme needs a full application.


Planning in Totteridge (N20): what to know before you apply
Totteridge extensions almost always run as full householder applications to Barnet, since the long-standing Article 4 directions remove the permitted-development route across the conservation area. We prepare a heritage-and-landscape-aware set, checking tree constraints and any Green Belt overlap before submission.
Typical Totteridge housing stock
Large detached houses, former farmhouses and villas set along the ridge of Totteridge Lane and Totteridge Village, on deep plots with paddocks, mature trees and green verges giving the area its semi-rural character.
Streets we regularly draw for in Totteridge
Totteridge Lane · Totteridge Village · Grange Avenue · Barnet Lane
What N20 is actually built of
Measured from 391 classified residential buildings in N20, not from a description of the area.
Totteridge N20 housing mix
Residential building form across the N20 postcode district, from 391 classified buildings.
| Attached on more than one side | 23% |
|---|---|
| Attached on one side | 54% |
| Detached | 24% |
| Median building footprint | 93 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.42 |
| Buildings classified | 391 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Building Regulations Drawings for Totteridge (N20) homes: the package and the process
A Full Plans submission is a technical argument, not a picture. The sheets carry construction build-ups for floors, walls and roof, insulation values and junction details, drainage runs and invert levels, fire escape routes and protected stairs, ventilation provision and the structural elements that carry it all. Building Control checks each against the Approved Documents before work starts.
We coordinate the structural design with the architectural sheets in-house, so the beam sizes on the calculations are the beam sizes on the sections, and the openings your builder prices are the openings that were approved. Where a detail is unusual, we draw it rather than leave it to be resolved on site.
Construction details follow the existing fabric. Solid brick walls, suspended timber floors and uninsulated roofs each need a different build-up to reach the required performance, and a terrace has party wall junctions to detail that a detached house simply does not.
What do building regulations drawings cover?
A building control package translates the approved design into a buildable, compliant specification.
- Construction sections and detailed junctions
- Structural drawings and calculations (steel beams, foundations, loadings)
- Part L thermal performance and insulation specification
- Fire safety — escape routes, protected structure, alarms
- Drainage and ventilation layouts
Full Plans or Building Notice — which should I choose?
A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly. Building regulations are a separate consent from planning permission, and the two are often confused — the explainer on permitted development rights sets out which projects escape a planning application but still need building-regs approval, and Architectural Drawings covers the same building-regs package where you want a chartered practice to carry it through to sign-off.
Why coordinate structural calculations in-house?
When the same team draws the building and calculates its structure, the steel schedule matches the drawings and the builder never waits on a missing detail. It removes the classic gap between an architect's drawings and a separately-appointed engineer's calculations.
| Factor | Full Plans | Building Notice |
|---|---|---|
| Drawings checked before work starts | Yes | No |
| Up-front certainty | High — approval in writing | Lower — inspected as built |
| Best for | Extensions, lofts, structural work | Minor, simple works |
| Evidence for lenders and buyers | Full approval record | Completion certificate only |
| Risk of costly on-site rework | Low | Higher if issues are found late |

Building Regulations Drawings in Totteridge N20 — FAQs
Do I need building regulations approval as well as planning permission?+
How long does Building Control approval take?+
Can building regulations drawings be done after planning approval?+
Are structural calculations included?+
Can you submit to Building Control for me?+
Do I need planning permission for a loft or extension in Barnet?+
What is different about building in Hampstead Garden Suburb?+
Is a hip-to-gable loft conversion allowed on my Barnet semi?+
How long does Barnet take to decide an application?+
How much do Barnet planning drawings cost?+
Get your free Totteridge planning assessment
Tell us your Totteridge (N20) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.