
Basement Conversion Drawings in Greenford UB6
Fixed-fee, MCIAT-chartered basement conversion drawings for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.
The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.


Planning in Greenford (UB6): what to know before you apply
No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.
Typical Greenford housing stock
Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.
Streets we regularly draw for in Greenford
Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue
What UB6 is actually built of
Measured from 299 classified residential buildings in UB6, not from a description of the area.
Greenford UB6 housing mix
Residential building form across the UB6 postcode district, from 299 classified buildings.
| Attached on more than one side | 44% |
|---|---|
| Attached on one side | 54% |
| Detached | 2% |
| Median building footprint | 62 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.52 |
| Buildings classified | 299 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Basement Conversion Drawings for Greenford (UB6) homes: the package and the process
A basement package is led by its section. It has to show the existing structure, the proposed floor level, retained or underpinned walls, the tanking system, and how the finished room achieves head height without undermining what sits above. Structural design and architectural design are drawn together because here they are the same decision.
Habitable basement rooms also need light, ventilation and escape. The drawings set out lightwells and their guarding, mechanical ventilation where natural is not achievable, and an escape route that Building Control will accept — usually a protected stair, sometimes an external route out of the lightwell.
What sits below the house decides the route. An existing cellar under a Victorian terrace is a conversion with a known volume, while a house with no cellar is a dig-out with underpinning, structural design and a very different drawing set — and the two are rarely interchangeable.
Do I need planning permission for a basement conversion in London?
An internal conversion of an existing cellar — new floor, insulation, a habitable layout — often does not need planning permission, because the works sit entirely within the existing structure and do not change its external appearance. Digging out a new basement, lowering an existing floor to gain headroom, or enlarging the footprint under a garden usually does, particularly where excavation extends beyond the existing building line. Any external alteration needed to serve the basement — a front light well, a sunken external staircase, or altering the pavement or front garden — is also likely to need planning permission in its own right, even when the basement works themselves would not. In a conservation area, a front light well tends to draw closer scrutiny than the same feature elsewhere, since it changes the street-facing elevation and the pavement it sits within — one more reason we assess the whole scheme, not just the room below ground, before recommending a route.
Cellar conversion or new dig-out — which route fits your property?
The two starting points lead to very different drawing sets. A cellar conversion works with a void that already exists: the drawings focus on damp-proofing, insulation, headroom, natural or borrowed light, means of escape and a compliant layout, coordinated with building regulations rather than planning.
A new dig-out or floor-lowering project starts from a structural decision — how the existing foundations will be underpinned to allow excavation beneath them — and the drawings and structural calculations are produced together from the outset, since the sequence of underpinning, temporary works and waterproofing has to be engineered before a builder can safely start.
What structural design does underpinning a basement need?
Lowering a floor or digging a new basement beneath an existing house means underpinning its foundations in sequenced sections, so the building above stays supported throughout. We produce the structural drawings and calculations for the underpinning sequence, any new steel beams or retaining walls, and the interaction with neighbouring foundations, in-house as part of the same package — so your structural engineer sign-off and your architectural drawings are never out of step with each other.
The sequencing matters as much as the sizing: underpinning is dug and cast in short, alternating sections so the existing wall is never left unsupported over any significant length, and the drawings set out the order those sections are worked in alongside the retaining and waterproofing detail. Getting that sequence wrong is one of the most common causes of cracking and delay on a basement project, which is why we treat it as a design decision rather than something left for the contractor to work out on site.
| Route | Typical scope | Planning position | Fee from |
|---|---|---|---|
| Existing cellar conversion | Fit-out of an existing void, no excavation | Usually building regulations only | £2,400 |
| Floor lowering / partial dig-out | Increases headroom within the existing footprint | Often needs planning permission | £3,200 |
| New-build basement or light well extension | New basement area beyond the existing footprint | Full planning plus Party Wall Act | £3,850 |

Basement Conversion Drawings in Greenford UB6 — FAQs
How much do basement conversion drawings cost in London?+
Does a basement conversion need planning permission?+
Will I need a party wall agreement for a basement conversion?+
Are structural calculations included in a basement conversion package?+
Do I need an architect for a basement conversion?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Greenford planning assessment
Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.