MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportWraparound Extension Drawings in Southgate Green N14

Rear extension drawings for a period house at Southgate Green N14, London Borough of Enfield
Southgate Green · N14 · Enfield

Wraparound Extension Drawings in Southgate Green N14

Fixed-fee, MCIAT-chartered wraparound extension drawings for Southgate Green (N14) homeowners — London Borough of Enfield validation and local constraints handled from the start.

Free Southgate Green planning assessment

Tell us your Southgate Green (N14) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Southgate (N14) is anchored by Southgate Green, a historic green ringed by Georgian and Victorian houses and more than thirty listed structures, with Edwardian and interwar semis on the surrounding streets where most of our extension and loft work sits.

Because the Article 4(2) directions made in 2009 remove permitted-development rights on frontages inside the conservation area, we check the mapped boundary and listing status before advising whether a scheme is genuinely PD or needs a full application with heritage justification.

Rear extension drawings for a period house at Southgate Green N14, London Borough of Enfield
Isometric illustration of a Southgate Green N14 home wraparound extension drawings design
Proposed floor plan
Southgate Green N14

Planning in Southgate Green (N14): what to know before you apply

Most Southgate extensions run as householder applications to Enfield, with a heritage statement where the property is inside the Southgate Green Conservation Area. The 2009 Article 4(2) directions remove PD rights on street-facing elevations, and listed-building consent can be required near the green, so we confirm boundary and listing status first.

Typical Southgate Green housing stock

A historic green fringed by Georgian and early Victorian houses and over thirty listed buildings and structures, giving way to Edwardian and interwar semis and villas on the surrounding N14 streets around Conway Road.

Streets we regularly draw for in Southgate Green

The Green · Conway Road · Waterfall Road · Ulleswater Road

What N14 is actually built of

Measured from 310 classified residential buildings in N14, not from a description of the area.

Southgate Green N14 housing mix

Residential building form across the N14 postcode district, from 310 classified buildings.

Attached on more than one side20%
Attached on one side70%
Detached10%
Median building footprint80 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.25
Buildings classified310

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Wraparound Extension Drawings for Southgate Green (N14) homes: the package and the process

A wraparound is assessed as one addition, so the drawings have to present it as one: a single proposed footprint with the rear depth and the side width both dimensioned, the roof drawn as it turns the corner, and the remaining garden shown on the site plan.

The corner is where the technical work sits. Two roof planes and two structural spans meet at the return, drainage has to get round it, and the internal opening is usually wide enough to need a designed frame rather than a single beam. We resolve that junction on the drawings before it becomes a question on site.

A wraparound needs both a rear garden and a side alley, which in practice means a terrace or end-of-terrace with an outrigger. Where only one of the two exists, the honest answer is a rear extension or a side return — the combined footprint has nowhere to turn the corner.

What makes a wraparound extension different from a rear or side return alone?

A rear extension adds depth at the back of the house; a side return adds width down the alley; a wraparound does both at once, so the new floor area turns the corner of the original building rather than sitting against just one wall. The result is typically the largest open-plan space a single-storey extension can deliver, but it also means more of the original external wall is removed and more of the roof is new, which raises the structural and drainage stakes compared with either extension on its own. Homeowners who start out planning a rear extension or a side return alone often move to a wraparound once they see how little extra it costs to combine the two, since much of the groundwork, roof structure and glazing is shared between them rather than duplicated.

Do wraparound extensions need full planning permission in London?

Almost always, yes. Permitted development allowances are calculated on combined additions to the original house, and a wraparound's depth plus width together generally exceed the volume and footprint limits that apply to a rear extension or side extension considered separately. A Lawful Development Certificate route is rarely viable for a genuine wraparound.

Conservation area status and Article 4 directions, common across the terraced streets where wraparound extensions are most popular, remove permitted development rights further still, so we design every wraparound on the assumption it will go through full householder planning.

Structural design for a wraparound extension

Because the new space turns a corner, the structural frame has to work as one continuous system rather than two independent extensions bolted together.

  • A continuous steel or ring-beam frame carrying the roof around the internal corner where the rear and side elements meet
  • A glazed roof lantern or rooflight strip often placed at the corner junction, where natural light reaches deepest into the combined plan
  • Foundations for both the rear and side elements designed together, so they tie into the existing house consistently
  • Bi-fold or sliding doors across the rear elevation, coordinated with the side glazing so the two elements read as one space
Wraparound extension planning routes
RouteWhat it coversTypical fee
Full planning permissionRequired for almost all wraparound extensions given the combined footprintFull Planning pack ~£1,600–£2,400
Planning + Building Regulations (structural)Combined pack including structural calculations for the L-shaped frame and drainage diversionPlanning + Building Regs pack ~£2,200–£3,850
Rear extension alone (comparison)Smaller single-storey addition, may qualify for permitted developmentsee Rear Extension Drawings, from £1,100
Side return alone (comparison)Widens the kitchen only, keeps garden depth unchangedsee Side Return Extension Drawings, from £1,400
Sheet from a wraparound extension drawings package drawn for a Southgate Green property in N14, showing the existing and proposed arrangement at scale
A sheet from the wraparound extension drawings package we submit to London Borough of Enfield for Southgate Green (N14) properties.
FAQ

Wraparound Extension Drawings in Southgate Green N14 — FAQs

How much does a wraparound extension cost to design in London?+
Wraparound extension drawings start from £2,200, covering full planning permission and structural design for the combined frame. Adding building regulations and construction detail brings the package to the Planning + Building Regs band, up to around £3,850, fixed and agreed upfront.
Does a wraparound extension always need planning permission?+
In almost every case, yes. The combined depth and width of a rear and side return together generally exceed permitted development limits, so we design wraparound projects on the assumption a full householder planning application is needed.
Do I need an architect for a wraparound extension?+
No. DrawingsDirect is an MCIAT-chartered architectural technologist practice, producing the same council-accepted drawings and structural coordination as an architect, for a fixed fee typically around 30% lower, with one team responsible for both the rear and side return elements rather than two separately briefed designers.
Will I need a Party Wall Agreement for a wraparound extension?+
Usually, because the side return element of a wraparound typically builds against or close to the boundary with the neighbouring property. We prepare the drawings your Party Wall surveyor needs alongside the planning application, timed so the notice period runs in parallel with the council's determination rather than adding to your overall timescale.
How long does it take to get wraparound extension drawings?+
Drawings are typically ready around 7 days from survey. A householder planning application then has a statutory 8-week determination period once submitted.
Do I need planning permission for a loft or extension in Enfield?+
Across Edmonton, Palmers Green and Enfield, the borough's interwar semis usually keep permitted development rights for rear extensions and hip-to-gable or dormer lofts, so a full application isn't always needed. Conservation areas such as Bush Hill Park and Winchmore Hill, and green-belt land to the north, remove or restrict those rights. We check your address first and confirm permitted development with a Lawful Development Certificate where it applies.
How does green-belt land affect my Enfield project?+
On green-belt properties toward the borough's northern edge, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
What does Enfield's borough-wide HMO Article 4 direction affect?+
Enfield applies a borough-wide Article 4 direction removing permitted development rights for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application anywhere in the borough. It doesn't affect a standard family extension, but we confirm whether it applies to your intended use before advising.
How long does Enfield Council take to decide?+
Enfield determines most householder applications within the statutory eight-week period once validated; conservation and green-belt cases can involve additional consultation. We prepare Enfield submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Enfield?+
We agree a fixed fee before starting, usually around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Enfield approves. A suburban loft and a green-belt or conservation case differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Southgate Green planning assessment

Tell us your Southgate Green (N14) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.