MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Structural Drawings in Camden

Historic Hampstead townhouses in the London Borough of Camden, a heavily conservation-controlled area
Camden · London

Structural Drawings in Camden

Fixed-fee, MCIAT-chartered structural drawings for Camden homeowners — London Borough of Camden validation and local constraints handled from the start.

Free Camden planning assessment

Tell us your Camden address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Camden is one of London's most heritage-dense and design-scrutinised boroughs: much of its housing sits within conservation areas such as Hampstead, Belsize, Primrose Hill, Fitzroy Square, Bloomsbury and Dartmouth Park, or is listed outright, and the council applies detailed control to rear extensions, dormers, materials and — above all — basements. The stock ranges from Georgian and early-Victorian townhouses and stucco-fronted terraces to Hampstead's Arts-and-Crafts housing, mansion blocks and the Victorian terraces of Kentish Town and Gospel Oak. In Hampstead, Belsize Park and Primrose Hill especially, applications reward drawings that respond precisely to the local townscape rather than a standard template.

Because near-borough-wide conservation coverage sits alongside a high density of listed buildings in Hampstead, Bloomsbury and Fitzrovia, permitted development cannot be assumed for roof alterations, front elevations or many rear works — a full householder application, and often listed-building consent, is usually needed. Camden also operates one of the most rigorous basement policies in London: any basement or lower-ground extension generally requires a Basement Impact Assessment addressing structural stability, drainage and groundwater. We take a validation-first approach, screening the conservation-area, listing and basement position for your exact address before a line is drawn, and coordinating the Basement Impact Assessment where a below-ground scheme is involved.

We prepare Camden planning and listed-building submissions to the council's validation and design standards across Camden Town, Kentish Town, West Hampstead and the wider borough, producing the same council-accepted drawings an architect would. The fee is agreed up front and fixed, drawings typically turn around in about seven days, and we redraw free until Camden approves. Camden has eight weeks from the day after it receives a valid application, unless a longer period is agreed in writing. Basement, conservation and listed-building cases can attract additional consultation, so a complete, correctly scaled submission matters.

Historic Hampstead townhouses in the London Borough of Camden, a heavily conservation-controlled area
Isometric illustration of a Camden home extension design
Proposed floor plan
Camden

Planning in Camden: what to know before you apply

Camden operates one of the most rigorous basement policies in London: schemes involving a basement or lower-ground extension generally require a Basement Impact Assessment addressing structural stability, drainage and groundwater. Add near-borough-wide conservation coverage and a high proportion of listed buildings, and permitted development cannot be assumed — we confirm the exact constraints before drawing.

Typical Camden housing stock

Georgian and early-Victorian townhouses, Hampstead's historic and Arts-and-Crafts housing, stucco-fronted terraces and mansion blocks, and Victorian terraces across Kentish Town and Gospel Oak.

Areas we regularly draw for in Camden

Hampstead · Camden Town · Kentish Town · Belsize Park · Primrose Hill · Bloomsbury · Gospel Oak · West Hampstead

What Camden is actually built of

Building form decides the structural problem. Removing a rear wall from a house attached on both sides means the load path has nowhere sideways to go, so the beam and its padstones do the work; a detached house usually has options a terrace does not. These are measured counts from Ordnance Survey building data, not a description of the borough.

Camden building stock

Residential building form across 5 of Camden's 6 postcode districts, from 1,296 classified buildings. Connectivity is topology: a semi extended into its garage reads as attached on more than one side.

Attached on more than one side59%
Attached on one side31%
Detached11%
Buildings attached on more than one side761
Detached buildings137
Buildings classified1,296
Postcode districts measured5

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-09-22.

Structural Drawings for Camden homes: the package and the process

Structural sheets are issued to be built from. Beam and lintel schedules give size, grade and bearing; connection details show how each element meets the next; and padstones, straps and restraint are drawn at the junctions rather than noted in general terms. Calculations are submitted alongside so Building Control can check the design rather than take it on trust.

Coordination with the architectural set is where the value is. A beam that is right in isolation but sits below the approved ceiling line, or a column that lands in a doorway, is a site problem that costs more to fix than it did to draw. We resolve those clashes in the drawing stage.

The existing structure sets the design. A terrace transfers load through party walls that are shared and often unrecorded, a semi through one; and floor construction — timber, concrete, or a mix from earlier alterations — changes how a new opening is supported and what has to be exposed to find out.

Do I need structural calculations to remove a load-bearing wall in London?

If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.

How steel beam sizing works

A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.

How much do structural drawings cost in London?

Structural drawings and calculations start from £745 for a single beam or wall removal, agreed as a fixed fee before work begins. The price depends on the number of beams or walls involved, whether foundations need designing from scratch (as with a rear or side extension), whether existing floor and roof structures need checking for extra loading (as with most loft conversions), and whether retaining or underpinning calculations are required, as they are for basement conversions. Where structural work is part of a wider extension or loft project, the all-inclusive package from £1,845 includes the calculation; with planning or building regulations drawings alone it is this separate fee.

Typical structural drawing scope by project
Project scopeWhat's includedFee guide
Single beam or wall removalOne steel calculation plus a drawing showing beam size, padstones and bearingsFrom £745
Loft conversion structural packageFloor and roof loading checks, beam calculations, staircase opening designIn the all-inclusive package from £1,845
Rear or side extension structural packageFoundation design, steel beam calculations, roof loading checksIncluded within planning and building regs packages from £1,845–£3,145
Basement or retaining structureUnderpinning, retaining wall and waterproofing-adjacent structural calculationsQuoted individually — ground conditions vary
Example structural drawings sheet, drawn to the standard London Borough of Camden validates against
Example sheet showing how we draw structural drawings to London Borough of Camden's validation standards.
FAQ

Structural Drawings in Camden — FAQs

Do I need a structural engineer to remove a wall in my London home?+
Yes, if the wall is load-bearing — which most internal walls between a kitchen and reception room are. A named, insured engineer we work with prepares the calculation and we coordinate it with your drawings, so you do not need to find and brief an engineer yourself.
How long do structural calculations take?+
Structural drawings are typically ready within about 7 days of instruction, in line with the rest of our drawing packages, and are produced alongside your architectural and building regulations drawings so everything is issued together.
Will the steel beam on my drawings match what my builder orders?+
Yes — because we produce the architectural drawings and coordinate the structural calculation together, the beam size, position and bearings shown on your plans are the ones the calculation specifies, so there is nothing for your builder to reconcile on site.
Can you produce structural drawings without handling my full planning application?+
Yes, a standalone structural calculation is available if you already have architectural drawings and just need a wall or beam calculated and signed off for Building Control.
Do structural calculations need to be submitted to Building Control?+
Yes — a structural calculation is a required part of a Full Plans or Building Notice submission wherever a load-bearing wall, beam or foundation is involved, and Building Control will not approve the work without one.
Do I need planning permission for a rear extension in Camden?+
Frequently, yes. Much of Camden sits within a conservation area or is listed, and in a conservation area dormers and other roof enlargements, side extensions, rear extensions over one storey and cladding are not permitted development. On unlisted homes outside a conservation area a rear extension may still qualify, but in Hampstead, Belsize Park and Primrose Hill a full application is usually needed. We confirm the exact constraints for your address before drawing.
What is a Basement Impact Assessment and will I need one in Camden?+
Camden operates one of the most rigorous basement policies in London. Schemes involving a basement or lower-ground extension generally require a Basement Impact Assessment addressing structural stability, drainage and groundwater. If you are considering below-ground space we flag the requirement early and coordinate the assessment so the application is complete when it is submitted.
Can I make changes to a listed building in Camden?+
Often, but listed-building consent is usually required alongside — or instead of — planning permission, and internal as well as external changes can be controlled. Camden has a high density of listed buildings in Hampstead, Bloomsbury and Fitzrovia. We screen listing status for your address first and prepare the heritage-led drawings and justification the council expects.
How long does Camden take to decide an application?+
Camden's eight weeks begin the day after it receives a valid application and extend only by written agreement. Basement, conservation and listed-building cases can involve more consultation, so we prepare to its standards.
How much do planning drawings cost in Camden?+
We agree a fixed fee before we start, taken from our published price list, with free redraws until Camden approves. A conservation-area rear extension, a basement and a listed-building scheme differ in the evidence required, so we quote once we have seen your project rather than by the hour.