MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Prior approval for a larger rear extension in Barking and Dagenham: drawing for the neighbour who reads it

Long straight road of brick terraced houses in Barking seen from a footbridge, the kind of street where a rear extension sits close to neighbours
Prior Approval Extension Barking and Dagenham

Prior approval for a larger rear extension in Barking and Dagenham: drawing for the neighbour who reads it

Barking and Dagenham's council let 501 larger home extension notifications through as "prior approval not required" over the eight quarters from 2024 Q3 to 2026 Q2, but of the 85 that needed a decision it refused 71. The difference is usually one neighbour's wall. We draw the set so that wall is easy to judge, for a fixed £595.

Fixed fee from £395 drawings + £200 survey (£595 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

What the register says for this borough

MHCLG publishes each council's larger home extension outcomes every quarter. For Barking and Dagenham, across the eight quarters from 2024 Q3 to 2026 Q2, the council recorded 501 notifications where prior approval was not required, 14 granted and 71 refused.

So most notifications here are a go-ahead: "not required" means the council saw nothing it needed to decide. Of the 85 that did need a decision, 71 were refused. That is about 84% by our calculation from those counts, and it is a statement about this borough's register, not a prediction for your house.

Prior Approval Extension Barking and Dagenham

from £595

£395 drawings + £200 survey (£595 total)

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • A measured survey visit to the house and garden
  • Site plan showing the extension and the boundaries it runs along
  • Existing and proposed ground floor plan and rear elevation
  • Depth, maximum height and eaves height written out for the council
  • The list of adjoining addresses the council must notify
  • Submission as your agent, with replies to the council's questions
Cutting the objection before it is written
  1. Find the tight boundary

    We measure the wall and window nearest each neighbour on the survey day.

  2. Fix the height there

    Eaves and roof pitch are set so the wall by the neighbour is as low as it can be.

  3. Draw it plainly

    The elevation shows that height against the neighbour's wall, so nothing is left to imagine.

  4. Send and wait

    The council writes to neighbours; work may start if it says nothing within 42 days.

Why a refusal here is about one wall

The council can only judge the effect on the adjoining homes, not the design. A refusal therefore tends to follow a neighbour who wrote in about light or outlook, and a set of drawings that left the boundary height to guesswork.

The cure is on the drawing. We show the depth along each boundary, the eaves height and the maximum height, and we set the roof so the wall beside the nearest neighbour stays low. Where the 6 m depth looks hard to defend against a close neighbour, we say so on the survey day and price a shallower scheme or the householder route before anything is submitted.

Edwardian gabled houses on a residential street with spring blossom
Finished kitchen extension with an exposed brick wall and a range cooker

The scheme gives up to 6 m behind the original rear wall of a house other than a detached one, and 8 m for a detached house, at no more than 4 m high.

Our analysis of the MHCLG Planning Data Platform conservation-area register (extracted 19 Oct 2026). www.planning.data.gov.uk

Conservation areas and Article 4 directions

The Planning Data Platform lists 4 live conservation areas in the borough. The 6 m and 8 m depths do not apply in a conservation area, so a house inside one needs a planning application for a deeper extension.

The same register shows 2 Article 4 direction areas that withdraw the Class A extension rights. Inside one, the larger home extension route is not available. We check the council's map for your address on the survey day, before you pay for drawings you could not use.

The limits that still apply

The scheme gives up to 6 m behind the original rear wall of a house other than a detached one, and 8 m for a detached house, at no more than 4 m high. The council has 42 days from a complete notification; if it has not notified a decision by then, work may start. The council's own fee is £249, paid direct.

Read the full rules on our prior approval service page. Prior approval is a planning answer only: you still need building regulations approval, and party wall notices if the work touches a shared wall.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
6 metresGPDO 2015 Sch 2 Pt 1 Class A.1(g): larger single-storey rear extension, maximum depth beyond the rear wall for a house other than detached, subject to prior approval under A.4 (source wording: "6 metres")www.legislation.gov.uk
8 metresGPDO 2015 Sch 2 Pt 1 Class A.1(g): larger single-storey rear extension, maximum depth beyond the rear wall for a detached house (source wording: "8 metres")www.legislation.gov.uk
4 metresGPDO 2015 Sch 2 Pt 1 Class A.1(f)-(g): a single-storey rear extension may not exceed 4 metres in height (source wording: "exceed 4 metres in height")www.legislation.gov.uk
42 daysGPDO 2015 Sch 2 Pt 1 Class A.4(10)(c): work may start if the council has not notified a decision within 42 days of receiving the information (source wording: "the expiry of 42 days")www.legislation.gov.uk
£249Statutory fee from 1 April 2026: prior approval for a householder larger rear extension (GPDO Part 1 Class A)assets.publishing.service.gov.uk
501Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
14Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
71Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
4Our analysis of the MHCLG Planning Data Platform conservation-area register (extracted 19 Oct 2026)www.planning.data.gov.uk
2Our analysis of the MHCLG Planning Data Platform article-4-direction-area register (extracted 19 Oct 2026)www.planning.data.gov.uk
FAQ

Questions people ask

Do most larger extension notifications in Barking and Dagenham go through?
Most are recorded as prior approval not required: 501 across the eight quarters from 2024 Q3 to 2026 Q2. Of the 85 that needed a decision, 14 were granted and 71 refused.
Why are so many decided cases refused?
We cannot see the council's reasons from the statistics. The scheme only tests the effect on neighbours, so clear boundary heights are the part of a set we can control.
Can I use the 6 m depth in a conservation area?
No. The larger depths do not apply on conservation area land. The borough has 4 live conservation areas on the national register, and we check your address against the council's map.
Is there an Article 4 direction on my street?
The register lists 2 areas that withdraw Class A extension rights. We check the council's map for your address; we do not guess from the street.
What does the council charge?
£249 for the notification, paid to the council. Our fixed £595 is separate.

Photographs: Des Blenkinsopp (CC BY-SA 2.0).