MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in West Drayton UB7

Rear garden extension behind an interwar West Drayton UB7 semi in Hillingdon
West Drayton · UB7 · Hillingdon

Planning Permission in West Drayton UB7

Fixed-fee, MCIAT-chartered planning permission for West Drayton (UB7) homeowners — London Borough of Hillingdon validation and local constraints handled from the start.

Free West Drayton planning assessment

Tell us your West Drayton (UB7) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

West Drayton (UB7) is built around a large open village green fringed by fine Georgian and early-Victorian houses, several of them listed, with a much bigger belt of interwar and postwar suburban housing beyond. Most of the rear and loft extension work we prepare here is on that outer suburban stock, where Hillingdon's standard householder expectations apply.

The West Drayton Green conservation area protects the green and its surrounding listed houses, so on properties facing or near it, frontage changes, materials and rooflines face tighter control. We confirm where a UB7 property sits relative to the conservation-area boundary before recommending a permitted-development or full-application route.

Rear garden extension behind an interwar West Drayton UB7 semi in Hillingdon
Isometric illustration of a West Drayton UB7 home planning permission design
Proposed floor plan
West Drayton UB7

Planning in West Drayton (UB7): what to know before you apply

UB7's split between a listed-building-rich conservation core around The Green and a broad suburban hinterland means the right route depends heavily on location. Away from the green, Hillingdon's residential extension guidance governs; on or beside The Green, listed-building sensitivity and heritage-led design usually point to a full application.

Typical West Drayton housing stock

A historic core around The Green — fine Georgian and early-19th-century houses such as The Old House and Beechwood, with a listed former workhouse cottage row — set within a much larger area of interwar and postwar semis and terraces stretching towards Yiewsley and the railway.

Streets we regularly draw for in West Drayton

The Green · Church Road · Swan Road · Station Road

What UB7 is actually built of

Measured from 294 classified residential buildings in UB7, not from a description of the area.

West Drayton UB7 housing mix

Residential building form across the UB7 postcode district, from 294 classified buildings.

Attached on more than one side38%
Attached on one side53%
Detached9%
Median building footprint57 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.53
Buildings classified294

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Planning Permission for West Drayton (UB7) homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package drawn for a West Drayton property in UB7, showing the existing and proposed arrangement at scale
A sheet from the planning permission package we submit to London Borough of Hillingdon for West Drayton (UB7) properties.
FAQ

Planning Permission in West Drayton UB7 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for a loft conversion in Hillingdon?+
Hillingdon's Metro-land semis and detached houses in Ruislip, Eastcote and Ickenham suit hip-to-gable and dormer lofts, which frequently qualify as permitted development within the volume limits. The exceptions are the conservation areas — Ruislip Village, Uxbridge and Northwood — and green-belt land toward the Colne Valley. We check your address and can confirm permitted development with a Lawful Development Certificate.
How does the Colne Valley green belt affect my Hillingdon project?+
On green-belt properties toward the western edge of the borough, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
Does proximity to Heathrow affect my plans?+
It can toward the south of the borough, where aircraft-noise considerations may influence habitable-room and glazing design. We evidence these considerations within the application where they apply so the council can validate and approve without repeated revisions.
How long does Hillingdon Council take to decide?+
Hillingdon determines most householder applications within the statutory eight-week period once validated; green-belt and conservation cases can involve additional consultation. We prepare Hillingdon submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Hillingdon?+
We work to a fixed fee agreed upfront, usually around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Hillingdon approves. A dormer loft, a suburban extension and a green-belt case differ in the evidence required, so we confirm the fee once we understand your project rather than billing by the hour.
Free Fixed Quote

Get your free West Drayton planning assessment

Tell us your West Drayton (UB7) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.