MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Planning Permission in Ealing Broadway W5

Rear extension drawings for an Edwardian villa in Ealing Broadway W5, London Borough of Ealing
Ealing Broadway · W5 · Ealing

Planning Permission in Ealing Broadway W5

Fixed-fee, MCIAT-chartered planning permission for Ealing Broadway (W5) homeowners — London Borough of Ealing validation and local constraints handled from the start.

Free Ealing Broadway planning assessment

Tell us your Ealing Broadway (W5) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Ealing Broadway (W5) is the heart of 'Queen of the Suburbs' Ealing, and the housing reflects it — substantial Victorian and Edwardian villas climbing the hill north of the Broadway, with mansion flats and larger subdivided houses nearer the station. The scale of these plots means loft conversions, rear extensions and outbuildings are common, but so is the conservation-area control that shapes them.

Three conservation areas meet across the district: Mount Park on the higher ground to the north, Ealing Common to the east and Ealing Green to the south. Which one a property falls in changes what is achievable on the roof and front elevation, so we establish the boundary and the borough's guidance before recommending a permitted-development or full-application route.

Rear extension drawings for an Edwardian villa in Ealing Broadway W5, London Borough of Ealing
Isometric illustration of a Ealing Broadway W5 home planning permission design
Proposed floor plan
Ealing Broadway W5

Planning in Ealing Broadway (W5): what to know before you apply

W5 carries no borough-wide Article 4 direction affecting typical householder work, so many Ealing Broadway houses retain permitted development rights for rear and loft projects — but the Mount Park, Ealing Common and Ealing Green conservation areas are the significant exceptions, and the generous villa plots mean extensions are judged closely against neighbouring building and garden lines. London Borough of Ealing does not publish an Article 4 schedule to the national open-data register, so we verify the current position with the council before advising.

Typical Ealing Broadway housing stock

Large late-Victorian and Edwardian villas and semi-detached houses on the hill north of the Broadway, many on generous plots, alongside Edwardian mansion flats and subdivided family houses closer to the station.

Streets we regularly draw for in Ealing Broadway

Mount Park Road · Castlebar Road · The Mall · Grange Road · Uxbridge Road

What W5 is actually built of

Measured from 461 classified residential buildings in W5, not from a description of the area.

Ealing Broadway W5 housing mix

Residential building form across the W5 postcode district, from 461 classified buildings.

Attached on more than one side45%
Attached on one side42%
Detached12%
Median building footprint71 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.79
Buildings classified461

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-09-22.

Planning Permission for Ealing Broadway (W5) homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£645–£995
Full Planning pack10–14 working daysCouncil liaison & design statement£745–£1,495
Planning + Building Regs pack14–21 working daysStructural calculations included in this all-inclusive pack£1,845–£3,145
Example planning permission sheet showing the existing and proposed arrangement at scale, as we draw it for Ealing Broadway (W5) properties
Example sheet showing how we draw planning permission to London Borough of Ealing's validation standards for Ealing Broadway (W5) properties.
FAQ

Planning Permission in Ealing Broadway W5 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
We check every drawing against your borough's local plan before submission to reduce the risk. If the council does refuse, we advise on revisions or an appeal, and a revised application is often the quicker route. Since 6 December 2023 a resubmission pays the full council fee again.
Do you cover my borough?+
Yes — we prepare drawings for all 33 London boroughs. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for a rear extension in Ealing?+
Many Ealing semis and terraces keep permitted development rights for a single-storey rear extension, so a full application isn't always needed. In a conservation area such as Bedford Park or Pitshanger, dormers and other roof enlargements, side extensions, rear extensions over one storey and cladding are not permitted development. The borough-wide Article 4 direction on HMO conversions is a separate change-of-use control. We check your address against the designations first and, where it qualifies, confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. In a conservation area dormers and other roof enlargements, side extensions, rear extensions over one storey and cladding are not permitted development, so we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects.
How long does Ealing Council take to decide a householder application?+
Ealing has eight weeks from the day after it receives a valid application, unless a longer period is agreed in writing. We follow the council's validation checklist: correctly scaled existing and proposed plans, elevations and a location plan.
Can you help with a loft conversion on a 1930s Ealing semi?+
Yes. Ealing's Metro-land semis in Perivale, Greenford and Northolt suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development on semi-detached homes within the volume limits. We confirm eligibility against those limits and any Article 4 or conservation constraint, then produce the planning and building-regulations drawings.
How much do planning drawings cost in Ealing?+
We work to a fixed fee agreed before we start, taken from our published price list, with free redraws until Ealing grants approval. The exact figure depends on the project — a single-storey rear extension differs from a double-storey or a loft — so we quote once we understand your scheme rather than on an open-ended hourly basis.
Free Fixed Quote

Get your free Ealing Broadway planning assessment

Tell us your Ealing Broadway (W5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.