
New Build Drawings in Orpington BR6
Fixed-fee, MCIAT-chartered new build drawings for Orpington (BR6) homeowners — London Borough of Bromley validation and local constraints handled from the start.
Orpington (BR6) is mostly interwar and post-war suburbia wrapped around older cores — the Priory and Church Hill in the town centre, Broomhill to the west, and the surviving village streets of Farnborough and Chelsfield out toward the Green Belt. Extensions and loft conversions on the suburban stock are the bulk of our work here.
Four Bromley conservation areas shape planning in BR6 — Orpington Priory, Broomhill, Farnborough Village and Chelsfield — and properties within them face enhanced scrutiny on rooflines and materials, with applications there often running to ten to thirteen weeks. We check a BR6 address against these before drawing.


Planning in Orpington (BR6): what to know before you apply
Most of BR6 sits outside a conservation area and keeps permitted development rights for rear and loft work, and we have found no householder Article 4 direction here. But inside the Orpington Priory, Broomhill, Farnborough Village or Chelsfield conservation areas permitted development narrows and design scrutiny rises on rooflines and materials, and the Green Belt around Downe and Cudham brings its own limits — so we confirm the conservation-area and Green Belt position on Bromley's map first.
Typical Orpington housing stock
Interwar and post-war suburban housing across much of Orpington, wrapped around historic pockets — the Grade II* listed Priory and Church Hill core, the Broomhill area west of the town centre, and the old village streets of Farnborough and Chelsfield out toward the Green Belt.
Streets we regularly draw for in Orpington
Church Hill · Broomhill Road · Farnborough High Street · Church Road
What BR6 is actually built of
Measured from 377 classified residential buildings in BR6, not from a description of the area.
Orpington BR6 housing mix
Residential building form across the BR6 postcode district, from 377 classified buildings.
| Attached on more than one side | 24% |
|---|---|
| Attached on one side | 47% |
| Detached | 29% |
| Median building footprint | 80 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.03 |
| Buildings classified | 377 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
New Build Drawings for Orpington (BR6) homes: the package and the process
A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.
Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.
An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.
Is my plot suitable for a new build in London?
A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.
What does pre-application advice add to a new build project?
Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.
How do daylight, sunlight and overlooking affect a new build design?
London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.
| Stage | What it establishes | Typical fee guide |
|---|---|---|
| Feasibility | Whether the plot can support a new dwelling and the likely constraints | Quoted individually, from within the £2,500 new build fee |
| Pre-application advice | Written borough feedback on the scheme before a full application | Quoted individually alongside the planning fee |
| Full planning drawings | The complete drawing set submitted for planning permission | From £2,500 |
| Building regs and structural | Construction-ready drawings and calculations for building | From £2,200–£3,850, quoted once planning is settled |

New Build Drawings in Orpington BR6 — FAQs
How much do new build drawings cost in London?+
Can any garden or backland plot be built on in London?+
Do I need pre-application advice before a full new build application?+
Do you handle building regulations and structural drawings for a new build, or only planning?+
How long does a new build project take from feasibility to planning permission?+
Do I need planning permission for an extension in Bromley?+
Can I build a bigger extension because Bromley plots are larger?+
How does green-belt designation affect my Bromley project?+
How long does Bromley Council take to decide?+
How much do planning drawings cost in Bromley?+
Get your free Orpington planning assessment
Tell us your Orpington (BR6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.