MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportNew Build Drawings in Hounslow

Open-plan kitchen extension of the kind commonly added to Hounslow's Chiswick and Bedford Park terraces
Hounslow · London

New Build Drawings in Hounslow

Fixed-fee, MCIAT-chartered new build drawings for Hounslow homeowners — London Borough of Hounslow validation and local constraints handled from the start.

Free Hounslow planning assessment

Tell us your Hounslow address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Hounslow spans the tightly controlled Arts-and-Crafts streets of Bedford Park and the Victorian terraces of Chiswick, out through the interwar semis of Osterley and Hounslow to Feltham, Cranford and the Heathrow fringe. Side-return and rear extensions and loft conversions dominate in the east, while the west offers more generous suburban plots, so the right route depends heavily on where in the borough you are.

The constraints change with the address. Conservation areas at Bedford Park, Chiswick High Road, Strand-on-the-Green, Osterley Park, Isleworth Riverside and Spring Grove control materials, rooflines and front elevations — Bedford Park especially, where a standard permitted-development dormer or cladding change usually will not apply. Along the Thames at Strand-on-the-Green and Isleworth the flood zone must be addressed, aircraft-noise considerations near Heathrow can influence habitable-room and glazing design toward the west, and Article 4 directions remove permitted development for HMO conversions in parts of the borough. By contrast, the interwar semis of Osterley, Hounslow and Feltham often retain permitted development rights for rear extensions and lofts.

We prepare Hounslow planning drawings tuned to the specific area — carefully evidenced applications in Bedford Park and along the Chiswick riverside, and straightforward permitted-development extensions and lofts toward Osterley and Feltham — checking the constraints for your address first. It is the same council-accepted drawing set an architect would prepare, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the London Borough of Hounslow approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the start.

Open-plan kitchen extension of the kind commonly added to Hounslow's Chiswick and Bedford Park terraces
Isometric illustration of a Hounslow home extension design
Proposed floor plan
Hounslow

Planning in Hounslow: what to know before you apply

Hounslow applies Article 4 directions to HMO conversions in parts of the borough and controls design within its conservation areas — Bedford Park especially, where materials and rooflines are tightly controlled. Thames flood-zone considerations apply along the river, and aircraft noise is a factor toward Heathrow. We confirm what affects your exact address before drawing.

Typical Hounslow housing stock

Victorian and Edwardian terraces and the Arts-and-Crafts houses of Bedford Park across Chiswick, interwar semi-detached suburbia through Osterley, Hounslow and Feltham, and riverside and villa housing along the Thames at Strand-on-the-Green and Isleworth.

Areas we regularly draw for in Hounslow

Hounslow · Chiswick · Isleworth · Brentford · Feltham · Osterley · Bedford Park · Cranford

What the numbers say about Hounslow planning decisions

These are London Borough of Hounslow’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

All development decided in Hounslow

Every planning application London Borough of Hounslow decided over the four quarters to 2026 Q1, not only householder work — a new dwelling is decided in this wider pool.

Applications decided1,191
Granted851
Refused340
GrantedAcross all development types, so it is not comparable with the householder rate71%
Householder applications within itThe rest is the pool a new dwelling is decided in704

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

If London Borough of Hounslow refuses: appeal outcomes

Planning appeals against London Borough of Hounslow determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined690
Allowed283
Dismissed407
Householder appeals allowedFrom 352 householder appeals. England average 36%50%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

New Build Drawings for Hounslow homes: the package and the process

A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.

Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.

An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.

Is my plot suitable for a new build in London?

A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.

What does pre-application advice add to a new build project?

Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.

How do daylight, sunlight and overlooking affect a new build design?

London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.

New build project stages
StageWhat it establishesTypical fee guide
FeasibilityWhether the plot can support a new dwelling and the likely constraintsQuoted individually, from within the £2,500 new build fee
Pre-application adviceWritten borough feedback on the scheme before a full applicationQuoted individually alongside the planning fee
Full planning drawingsThe complete drawing set submitted for planning permissionFrom £2,500
Building regs and structuralConstruction-ready drawings and calculations for buildingFrom £2,200–£3,850, quoted once planning is settled
Sheet from a new build drawings package prepared for a Hounslow property, drawn to London Borough of Hounslow validation standards
A sheet from the new build drawings package we submit to London Borough of Hounslow.
FAQ

New Build Drawings in Hounslow — FAQs

How much do new build drawings cost in London?+
New build drawings start from £2,500 for feasibility and a full planning drawing set on a straightforward infill or backland plot, with building regulations and structural drawings quoted separately once the planning design is agreed.
Can any garden or backland plot be built on in London?+
Not necessarily — backland and garden plots are assessed on access, overlooking, loss of garden amenity for neighbours and borough policy, and a feasibility assessment gives an honest early view of whether a scheme is likely to be supported.
Do I need pre-application advice before a full new build application?+
It is not mandatory, but for a new dwelling — where the principle of development is often the main issue — pre-application advice can surface concerns early enough to address them in the design, reducing the risk of refusal.
Do you handle building regulations and structural drawings for a new build, or only planning?+
Both — the full new build service covers planning, building regulations and structural drawings from one in-house team, so the design stays consistent from feasibility through to construction-ready drawings.
How long does a new build project take from feasibility to planning permission?+
This varies with site complexity and whether pre-application advice is sought, but a full planning application is determined within the statutory period the borough applies to the application type, once submitted via the Planning Portal.
Do I need planning permission for an extension in Hounslow?+
It depends on the area. The interwar semis of Osterley, Hounslow and Feltham often retain permitted development rights for rear extensions and lofts, while the Chiswick terraces and Bedford Park sit within conservation areas where those rights are removed. We check your address against the designations first and can confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. A standard permitted-development dormer or cladding change usually won't apply; instead we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects.
Does Heathrow or the river affect my Hounslow project?+
They can. Toward the west of the borough, aircraft-noise considerations near Heathrow may influence habitable-room and glazing design, and along the Thames at Strand-on-the-Green and Isleworth the flood zone must be addressed. We evidence these considerations within the application where they apply so the council can validate and approve without repeated revisions.
How long does Hounslow Council take to decide?+
Hounslow determines most householder applications within the statutory eight-week period once validated; Bedford Park, conservation and riverside cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Hounslow?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Hounslow approves. A suburban Osterley extension and a Bedford Park application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Hounslow planning assessment

Tell us your Hounslow address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.