
HMO Conversion Drawings in Romford RM1
Fixed-fee, MCIAT-chartered hmo conversion drawings for Romford (RM1) homeowners — London Borough of Havering validation and local constraints handled from the start.
Romford (RM1) is built around one of London's oldest chartered markets, and the Romford Conservation Area protects the Market Place and the ancient crossroads where North Street, South Street and the High Street meet. Work on or near those frontages faces conservation-area control, so we always check where a property sits against the boundary before choosing a route.
Away from the protected core the district is mostly Victorian and Edwardian terraces with inter-war housing behind, and rear and side-return extensions plus loft conversions are the common projects. Havering's householder guidance sets clear expectations for these, and preparing drawings to match is how RM1 schemes clear first time.


Planning in Romford (RM1): what to know before you apply
There is no borough-wide Article 4 direction affecting typical RM1 householder work, so many Romford houses retain permitted development rights for rear and loft projects. The exception is the Romford Conservation Area around Market Place, where frontage, material and shopfront changes are controlled and permitted development is curtailed.
Typical Romford housing stock
A historic market-town core of shops and civic buildings around Market Place, ringed by Victorian and Edwardian terraces and later inter-war housing on the residential streets running off North Street and toward Como Street.
Streets we regularly draw for in Romford
Market Place · North Street · South Street · Como Street · Junction Road
What RM1 is actually built of
Measured from 212 classified residential buildings in RM1, not from a description of the area.
Romford RM1 housing mix
Residential building form across the RM1 postcode district, from 212 classified buildings.
| Attached on more than one side | 33% |
|---|---|
| Attached on one side | 57% |
| Detached | 10% |
| Median building footprint | 76 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.71 |
| Buildings classified | 212 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
HMO Conversion Drawings for Romford (RM1) homes: the package and the process
An HMO scheme is drawn against a schedule. Every bedroom is dimensioned with its usable floor area stated, shared kitchen and bathroom provision is counted against the number of occupants, and the layout has to hold up against the space standards the licensing team applies.
The fire strategy is drawn, not described: protected escape route, fire doors and their ratings, alarm coverage by room, and compartmentation between floors. Licensing and building control assess the same drawing set from different angles, so it has to satisfy both without contradiction.
Room count is a function of the existing plan. A large semi or detached house with generous rooms can meet the space standards without subdivision, while a narrow terrace usually cannot reach the same occupancy without creating rooms that fall below the minimum floor area.
C4 small HMO or sui generis large HMO — which applies to your property?
The distinction matters because it decides which rules apply. A small HMO housing three to six unrelated sharers who share amenities is Class C4. A large HMO of seven or more occupants is sui generis and always needs planning permission, since sui generis uses sit outside the permitted development system entirely. The line also shifts with occupancy — a property let to six sharers today can tip into sui generis territory the moment a seventh tenancy is signed, which changes the planning position even though nothing about the building itself has changed. We assess your proposed occupancy and layout against both definitions before drawing, so the application matches how the property will actually be let.
Do I need planning permission for an HMO conversion in London?
Converting a family home (C3) into a small HMO (C4) is technically permitted development under national rules, but a large number of London boroughs have made an Article 4 direction that removes this right across all or part of the borough — meaning a full planning application is required even for a small, compliant HMO. Article 4 directions vary street by street in some boroughs, so two similar houses a few doors apart can sit on opposite sides of the line. Any large HMO (sui generis) needs planning permission everywhere, regardless of Article 4. We check your specific address against the relevant borough's Article 4 direction before recommending a route, since guessing wrong wastes both time and application fees.
Mandatory and additional HMO licensing — what's required?
Most HMOs need a licence from the council, separate from any planning permission. A licence application typically has to demonstrate that the property meets fire safety, amenity and space standards, that gas and electrical installations are safety-certified, and that the landlord or managing agent is a fit and proper person to hold it.
Mandatory licensing
Applies to any HMO of five or more occupants forming two or more households, regardless of the number of storeys — a national requirement in every London borough.
Additional licensing
Many boroughs extend licensing to smaller HMOs, typically three or four occupants, across all or part of their area. We check the current scheme for your borough before you apply, since schemes and boundaries change.
| Factor | C4 small HMO (3–6 sharers) | Sui generis large HMO (7+) |
|---|---|---|
| Use class | C4 | Sui generis |
| Planning permission | Often needed due to Article 4 directions in most boroughs | Always needed |
| Licensing | Mandatory if 5+ occupants; additional licensing in many boroughs | Mandatory |
| Typical drawing package | From £1,400 | Full planning + building regs, from £2,200 |

HMO Conversion Drawings in Romford RM1 — FAQs
How much do HMO conversion drawings cost in London?+
Is HMO conversion permitted development in London?+
Do I need a licence as well as planning permission?+
Do I need an architect for an HMO conversion?+
How long do HMO conversion drawings take?+
Do I need planning permission for an extension in Havering?+
How does green-belt land affect my Havering project?+
Can I build a bigger extension because Havering plots are larger?+
How long does Havering Council take to decide?+
How much do planning drawings cost in Havering?+
Get your free Romford planning assessment
Tell us your Romford (RM1) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.