1930s house in North Acton stripped back for a major extension, roof timbers exposed, a mini excavator behind the fence and a blue-tarped skip
Guide

Basement conversion planning permission in London

Digging out new basement space under a London home often needs planning permission, and a party wall notice near a neighbour, while fitting out an existing cellar can need less. A householder application costs £548 and the council has 8 weeks to decide it. Our drawings for an existing cellar start at £1,995.

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Excavating new space and fitting out a cellar are different jobs

Two different projects share the name. A new basement means excavation, underpinning and often a lightwell. An existing cellar already has walls and a floor, and the work is lining, tanking and finishing it.

Decide which of the two you are doing before you ask the council anything. The answer changes the drawings, the structural design and the application. Our basement conversion drawings page shows how we scope each type.

What the council charges and how long it has

From 1 April 2026 the statutory fee for a householder application for alterations or extensions to a single dwellinghouse is £548, as set out in the government's annual planning fee indexation notice. The council has 8 weeks, beginning the day after it receives the application, to decide an application that is not major development (DMPO 2015, article 34(2)(b)).

You and the council can agree in writing to extend that period.

Metal stud partitions and plasterboard sheets during a conversion
Yellow crane lifting precast concrete floor slabs from a lorry on a building site with a steel frame behind

Our analysis of MHCLG planning application statistics, table PS2 (released 24 Sep 2026), counts 145,609 householder decisions across England in the four quarters from 2025 Q3 to 2026 Q2.

Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk

Party wall rules apply to a basement even where planning does not

Under section 6 of the Party Wall etc. Act 1996 you must notify an adjoining owner if you excavate within three metres of their building, below the level of its foundations. The distance rises to six metres where your excavation meets a 45-degree line drawn down from their foundations (Party Wall etc. Act 1996, section 6).

The notice must be served at least one month before you begin to excavate, so build that month into your programme. Our guide to the party wall agreement explains the steps.

How busy is the householder route?

Our analysis of MHCLG planning application statistics, table PS2 (released 24 Sep 2026), counts 145,609 householder decisions across England in the four quarters from 2025 Q3 to 2026 Q2. Householder applications are the standard route for work to a single home, and a basement scheme in that category joins a large, well-practised queue.

Boroughs differ in how they treat basements, and some publish their own guidance. Read your borough's before design starts.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Our fee and the next step

Our fixed fee for basement conversion drawings of an existing cellar starts at £1,995. A new excavation is priced after we see the site. For the whole budget, see our basement conversion cost guide.

Building Regulations are a separate approval. Our Building Regulations drawings cover the structure, waterproofing, ventilation and escape.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
145,609Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
three metresParty Wall etc. Act 1996 s6(1): excavating within three metres measured horizontally of an adjoining owner's building or structure below its foundations (source wording: three metres)www.legislation.gov.uk
six metresParty Wall etc. Act 1996 s6(2): excavating within six metres measured horizontally of an adjoining owner's building where it meets a 45-degree plane drawn down from its foundations (source wording: six metres)www.legislation.gov.uk
one monthParty Wall etc. Act 1996 s6(5): notice of the proposed excavation served at least one month before beginning to excavate (source wording: one month)www.legislation.gov.uk
8 weeksDMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: 8 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
£548Statutory fee from 1 April 2026, SI 2012/2920 Sch 1 Pt 2 category 6(1): householder application for alterations or extensions to a single dwellinghouseassets.publishing.service.gov.uk
£1,995DrawingsDirect starting fixed fee for basement conversion drawings (existing cellar), from the published price listdrawingsdirect.co.uk
FAQ

Questions people ask

Do I need planning permission to convert an existing cellar?
It depends on the work. Lining and finishing a cellar that is already part of the house can sit outside planning, while new excavation, lightwells or a change of use usually do not. Ask your council or send us the plans for a view.
When must I serve a party wall notice for a basement?
At least one month before you start excavating, where the excavation falls within the three or six metre distances in section 6 of the Act.
Does a basement conversion also need Building Regulations approval?
Structure, damp-proofing, fire escape and ventilation are all controlled by Building Regulations. It is a separate approval from planning permission.