MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Prior approval application: what it is and when you need one

Get My Free Report
Flat-fronted stock brick terrace with brightly painted front doors
Planning Glossary

Prior approval application: what it is and when you need one

Prior approval is a council check on certain permitted development, so it is not the same as planning permission. The right exists in law, but the council reviews specific points first. A larger home extension under Class A.4 may reach 6 metres beyond the original rear wall of a house that is not detached, and the fee is £249.

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

If this form is unavailable, use our contact options.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Prior approval is not planning permission

Permitted development gives a right to build without a planning application, within set limits. Some of those rights come with a condition: tell the council first and let it consider named matters. That consultation is prior approval. The council cannot refuse on general grounds of taste. It looks only at the matters the order lists for that class.

So the answer to whether prior approval is the same as planning permission is no. It is a lighter, narrower process that sits inside permitted development. Our permitted development entry sets out the wider rights it belongs to.

The larger home extension is the case most householders meet

Under Class A.1(g) of Part 1, Schedule 2 of the General Permitted Development Order, a house that is not detached can extend up to 6 metres beyond the original rear wall if it goes through the prior approval process in A.4 (GPDO 2015). Without that process the ordinary limit is lower.

The council notifies adjoining owners or occupiers and allows not less than 21 days for representations (Class A.4(5)(d)). Prior approval is required only if an adjoining owner or occupier objects. If one does, the council assesses the effect on the amenity of adjoining premises.

Red-brick terrace with white-painted gables and finials
Long terrace of dark red brick houses with flat-roofed bay windows and roof dormers, climbing a hill, with a white van parked in front

Under Class A.1(g) of Part 1, Schedule 2 of the General Permitted Development Order, a house that is not detached can extend up to 6 metres beyond the original rear wall if it goes through the prior approval process in A.4 (GPDO 2015).

GPDO 2015 Sch 2 Pt 1 Class A.1(g): larger home extension under the prior approval process (A.4), house other than detached, up to 6 metres beyond the original rear wall (source wording: 6 metres). www.legislation.gov.uk

The 42-day clock and the fee

A larger home extension may go ahead if the council has not notified its decision within 42 days of receiving the information (Class A.4(10)(c)). That deemed outcome applies to Class A.4 only, not to every prior approval type, so check the class you are using before you rely on it.

The national fee for a householder larger rear extension prior approval is £249 from 1 April 2026, per the MHCLG indexation table. It is a separate fee from our drawing work. Our own fixed fees are on the pricing page.

How prior approval has gone in London

Our analysis of MHCLG planning application statistics, table PS1 (released 24 September 2026), counts 3,452 larger home extension prior approvals determined, granted or refused, across the 33 London councils over the eight quarters from 2024 Q3 to 2026 Q2. Of those, 34% were granted.

That is the share among cases the council had to decide. Cases where no decision was needed are not in it. A low grant rate among decided cases tells you that objections matter, so talk to neighbours before you file.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Where drawings come in

A prior approval application still needs plans: the existing and proposed floor plans, elevations, a block plan, and the dimensions that show the extension stays inside the class. If you want to compare routes first, our guide to prior approval for a larger home extension sets them side by side, and our house extension drawings service prepares the set.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
6 metresGPDO 2015 Sch 2 Pt 1 Class A.1(g): larger home extension under the prior approval process (A.4), house other than detached, up to 6 metres beyond the original rear wall (source wording: 6 metres)www.legislation.gov.uk
21 daysGPDO 2015 Sch 2 Pt 1 Class A.4(5)(d): the council's notice to adjoining owners or occupiers gives a period of not less than 21 days for representations on a larger home extension (source wording: "being not less than 21 days from the date of the notice")www.legislation.gov.uk
42 daysGPDO 2015 Sch 2 Pt 1 Class A.4(10)(c): a larger home extension may go ahead if the council has not notified its decision within 42 days of receiving the information (source wording: "the expiry of 42 days following the date on which the information ... was received")www.legislation.gov.uk
£249Fees for planning applications in England from 1 April 2026 (MHCLG, SI 2012/2920 as annually indexed): prior approval for a householder larger rear extension or other alteration of a dwellinghouse (Part 1 Class A) (source wording: £249)assets.publishing.service.gov.uk
3,452Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
34%Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
FAQ

Questions people ask

What is prior approval in planning?
A council check on specific matters before certain permitted development goes ahead. The right to build exists in law, but you must notify the council and wait for its response.
When is prior approval required?
When the class you are using says so. The best known case is a larger home extension under Class A.4, which reaches 6 metres on a house that is not detached. Check the class wording or ask us before you start.
Is prior approval the same as planning permission?
No. It is a narrower check inside permitted development, with its own fee, £249 for a larger rear extension, and the council looks only at the matters the order names.
What happens if the council does not reply?
For a larger home extension under Class A.4, the work may go ahead if the council has not notified its decision within 42 days of receiving the information. Other prior approval types follow their own rules.

Photographs: Tim Green from Bradford (CC BY 2.0).