Prior approval application: what it is and when you need one
Prior approval is a council check on certain permitted development, so it is not the same as planning permission. The right exists in law, but the council reviews specific points first. A larger home extension under Class A.4 may reach 6 metres beyond the original rear wall of a house that is not detached, and the fee is £249.
Prefer to talk it through?
Prior approval is not planning permission
Permitted development gives a right to build without a planning application, within set limits. Some of those rights come with a condition: tell the council first and let it consider named matters. That consultation is prior approval. The council cannot refuse on general grounds of taste. It looks only at the matters the order lists for that class.
So the answer to whether prior approval is the same as planning permission is no. It is a lighter, narrower process that sits inside permitted development. Our permitted development entry sets out the wider rights it belongs to.
The larger home extension is the case most householders meet
Under Class A.1(g) of Part 1, Schedule 2 of the General Permitted Development Order, a house that is not detached can extend up to 6 metres beyond the original rear wall if it goes through the prior approval process in A.4 (GPDO 2015). Without that process the ordinary limit is lower.
The council notifies adjoining owners or occupiers and allows not less than 21 days for representations (Class A.4(5)(d)). Prior approval is required only if an adjoining owner or occupier objects. If one does, the council assesses the effect on the amenity of adjoining premises.


Under Class A.1(g) of Part 1, Schedule 2 of the General Permitted Development Order, a house that is not detached can extend up to 6 metres beyond the original rear wall if it goes through the prior approval process in A.4 (GPDO 2015).
The 42-day clock and the fee
A larger home extension may go ahead if the council has not notified its decision within 42 days of receiving the information (Class A.4(10)(c)). That deemed outcome applies to Class A.4 only, not to every prior approval type, so check the class you are using before you rely on it.
The national fee for a householder larger rear extension prior approval is £249 from 1 April 2026, per the MHCLG indexation table. It is a separate fee from our drawing work. Our own fixed fees are on the pricing page.
How prior approval has gone in London
Our analysis of MHCLG planning application statistics, table PS1 (released 24 September 2026), counts 3,452 larger home extension prior approvals determined, granted or refused, across the 33 London councils over the eight quarters from 2024 Q3 to 2026 Q2. Of those, 34% were granted.
That is the share among cases the council had to decide. Cases where no decision was needed are not in it. A low grant rate among decided cases tells you that objections matter, so talk to neighbours before you file.

Where drawings come in
A prior approval application still needs plans: the existing and proposed floor plans, elevations, a block plan, and the dimensions that show the extension stays inside the class. If you want to compare routes first, our guide to prior approval for a larger home extension sets them side by side, and our house extension drawings service prepares the set.
Sources
Every figure on this page, where it comes from and a link to the original.
| Figure | Source | Link |
|---|---|---|
| 6 metres | GPDO 2015 Sch 2 Pt 1 Class A.1(g): larger home extension under the prior approval process (A.4), house other than detached, up to 6 metres beyond the original rear wall (source wording: 6 metres) | www.legislation.gov.uk |
| 21 days | GPDO 2015 Sch 2 Pt 1 Class A.4(5)(d): the council's notice to adjoining owners or occupiers gives a period of not less than 21 days for representations on a larger home extension (source wording: "being not less than 21 days from the date of the notice") | www.legislation.gov.uk |
| 42 days | GPDO 2015 Sch 2 Pt 1 Class A.4(10)(c): a larger home extension may go ahead if the council has not notified its decision within 42 days of receiving the information (source wording: "the expiry of 42 days following the date on which the information ... was received") | www.legislation.gov.uk |
| £249 | Fees for planning applications in England from 1 April 2026 (MHCLG, SI 2012/2920 as annually indexed): prior approval for a householder larger rear extension or other alteration of a dwellinghouse (Part 1 Class A) (source wording: £249) | assets.publishing.service.gov.uk |
| 3,452 | Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 34% | Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
Questions people ask
What is prior approval in planning?
When is prior approval required?
Is prior approval the same as planning permission?
What happens if the council does not reply?
Photographs: Tim Green from Bradford (CC BY 2.0).