
Planning Permission in Bexley Village DA5
Fixed-fee, MCIAT-chartered planning permission for Bexley Village (DA5) homeowners — London Borough of Bexley validation and local constraints handled from the start.
Bexley Village (DA5) sits on the River Cray at the south-eastern edge of the borough, where the historic High Street winds down past cottages and shops to the green and St John's Church. Rear and side extensions on the Victorian and Edwardian houses ringing the old core are the most common projects here, and the village's semi-rural setting on the edge of the Metropolitan Green Belt shapes how the council reads them.
The Old Bexley Conservation Area, first designated in 1971 and extended in 1987, covers the winding High Street, the green and the riverside around the old ford, protecting 18 listed buildings and the prevailing local brick. Where a DA5 property sits relative to that boundary decides whether roofline, window and front-elevation changes are permitted development or need consent.


Planning in Bexley Village (DA5): what to know before you apply
Inside the Old Bexley Conservation Area the Article 4(2) Direction means front-elevation, roof, window and boundary changes that would be permitted development elsewhere need a full householder application, and the 18 listed buildings additionally require listed-building consent. Beyond the boundary, on the Edwardian and inter-war streets toward the station, many rear and loft projects still fall within permitted development, so we check the boundary and the Green Belt edge before advising a route.
Typical Bexley Village housing stock
The conservation-area core is a tight grain of 18th- and 19th-century brick cottages, listed timber-framed houses and Victorian shopfronts along the winding High Street, giving way to Edwardian villas and inter-war semis on the rising ground toward Bexley station and Parkhill Road.
Streets we regularly draw for in Bexley Village
High Street · Tanyard Lane · Manor Road · North Cray Road
What DA5 is actually built of
Measured from 275 classified residential buildings in DA5, not from a description of the area.
Bexley Village DA5 housing mix
Residential building form across the DA5 postcode district, from 275 classified buildings.
| Attached on more than one side | 28% |
|---|---|
| Attached on one side | 48% |
| Detached | 25% |
| Median building footprint | 84 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.08 |
| Buildings classified | 275 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Planning Permission for Bexley Village (DA5) homes: the package and the process
A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.
Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.
Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
How long does planning permission take, and what does it cost?
Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |

Planning Permission in Bexley Village DA5 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for an extension in Bexley?+
Can I build a bigger extension because Bexley plots are larger?+
What extra control applies in Old Bexley Village or around Danson Park?+
How long does Bexley Council take to decide?+
How much do planning drawings cost in Bexley?+
Get your free Bexley Village planning assessment
Tell us your Bexley Village (DA5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.