MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportBuilding Regulations Drawings in Hayes BR2

Two-storey side extension on a detached Hayes BR2 house, planning drawings for Bromley Council approval
Hayes · BR2 · Bromley

Building Regulations Drawings in Hayes BR2

Fixed-fee, MCIAT-chartered building regulations drawings for Hayes (BR2) homeowners — London Borough of Bromley validation and local constraints handled from the start.

Free Hayes planning assessment

Tell us your Hayes (BR2) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Hayes (BR2) is a green, low-density corner of the borough with roomy interwar detached and semi-detached homes, plus older village-core properties near Hayes station. The space on these plots lends itself to large rear extensions, two-storey side additions, garden rooms and loft conversions, most handled through Bromley's standard householder route.

The historic Hayes Village conservation area and the surrounding commons give the neighbourhood its identity and bring tighter control on materials, roofscape and anything affecting the open green setting. We design extensions that keep the generous plot gaps and building line intact and check tree protection near the commons, so schemes meet Bromley Council's conservation and amenity standards.

Two-storey side extension on a detached Hayes BR2 house, planning drawings for Bromley Council approval
Isometric illustration of a Hayes BR2 home building regulations drawings design
Proposed floor plan
Hayes BR2

Planning in Hayes (BR2): what to know before you apply

No published householder Article 4 direction in Hayes, so most work runs under permitted development or a standard Bromley householder application. Properties within the Hayes Village conservation area have reduced permitted-development rights, and plots near the commons face added scrutiny on trees, footprint and the protected green outlook.

Typical Hayes housing stock

Hayes (BR2) is a leafy outer south-east suburb of generous interwar detached and semi-detached houses on wide plots, with older Victorian and cottage-style properties clustered around the historic village. Large gardens backing onto or near Hayes and Keston Commons make substantial rear and two-storey side extensions common.

Streets we regularly draw for in Hayes

Pickhurst Rise · Warren Road · Hawes Lane · The Knoll

What BR2 is actually built of

Measured from 264 classified residential buildings in BR2, not from a description of the area.

Hayes BR2 housing mix

Residential building form across the BR2 postcode district, from 264 classified buildings.

Attached on more than one side27%
Attached on one side48%
Detached25%
Median building footprint76 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.37
Buildings classified264

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Building Regulations Drawings for Hayes (BR2) homes: the package and the process

A Full Plans submission is a technical argument, not a picture. The sheets carry construction build-ups for floors, walls and roof, insulation values and junction details, drainage runs and invert levels, fire escape routes and protected stairs, ventilation provision and the structural elements that carry it all. Building Control checks each against the Approved Documents before work starts.

We coordinate the structural design with the architectural sheets in-house, so the beam sizes on the calculations are the beam sizes on the sections, and the openings your builder prices are the openings that were approved. Where a detail is unusual, we draw it rather than leave it to be resolved on site.

Construction details follow the existing fabric. Solid brick walls, suspended timber floors and uninsulated roofs each need a different build-up to reach the required performance, and a terrace has party wall junctions to detail that a detached house simply does not.

What do building regulations drawings cover?

A building control package translates the approved design into a buildable, compliant specification.

  • Construction sections and detailed junctions
  • Structural drawings and calculations (steel beams, foundations, loadings)
  • Part L thermal performance and insulation specification
  • Fire safety — escape routes, protected structure, alarms
  • Drainage and ventilation layouts

Full Plans or Building Notice — which should I choose?

A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly. Building regulations are a separate consent from planning permission, and the two are often confused — the explainer on permitted development rights sets out which projects escape a planning application but still need building-regs approval, and Architectural Drawings covers the same building-regs package where you want a chartered practice to carry it through to sign-off.

Why coordinate structural calculations in-house?

When the same team draws the building and calculates its structure, the steel schedule matches the drawings and the builder never waits on a missing detail. It removes the classic gap between an architect's drawings and a separately-appointed engineer's calculations.

Full Plans vs Building Notice for a London project
FactorFull PlansBuilding Notice
Drawings checked before work startsYesNo
Up-front certaintyHigh — approval in writingLower — inspected as built
Best forExtensions, lofts, structural workMinor, simple works
Evidence for lenders and buyersFull approval recordCompletion certificate only
Risk of costly on-site reworkLowHigher if issues are found late
Sheet from a building regulations drawings package drawn for a Hayes property in BR2, showing the existing and proposed arrangement at scale
A sheet from the building regulations drawings package we submit to London Borough of Bromley for Hayes (BR2) properties.
FAQ

Building Regulations Drawings in Hayes BR2 — FAQs

Do I need building regulations approval as well as planning permission?+
Almost always, yes. Planning permission covers what the building looks like; building regulations cover how safely it is built. Most extensions and loft conversions need both.
How long does Building Control approval take?+
A Full Plans application is typically assessed within about five weeks. We prepare a complete package and respond to any conditions promptly, so approval is not held up by missing detail.
Can building regulations drawings be done after planning approval?+
Yes. Many homeowners secure planning permission first, then commission the building regulations package before starting on site. We can pick a project up at either stage.
Are structural calculations included?+
Yes — we produce structural drawings and calculations in-house as part of the building regulations package, so your builder has everything to price and build.
Can you submit to Building Control for me?+
Yes, we prepare and submit the Full Plans package and respond to any Building Control queries.
Do I need planning permission for an extension in Bromley?+
Bromley has no borough-wide Article 4 direction affecting typical householder permitted development, so its detached and semi-detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify. The binding constraints are green-belt policy on outer properties and conservation control in Chislehurst, Keston and Bromley Town. We check both and can confirm permitted development with a Lawful Development Certificate.
Can I build a bigger extension because Bromley plots are larger?+
Often, yes. Bromley's generous interwar plots make substantial rear and double-storey extensions viable where an inner-London terrace could not accommodate them. The limit is usually policy rather than space — green belt restricts scale on outer properties, and conservation areas control design. We design to use the plot fully within those limits, checking permitted-development allowances for detached homes first.
How does green-belt designation affect my Bromley project?+
On green-belt properties toward Orpington, Chislehurst and the borough's edges, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
How long does Bromley Council take to decide?+
Bromley determines most householder applications within the statutory eight-week period once validated. As London's largest borough by area, its casework spans suburban semis to green-belt properties, so a complete, correctly scaled submission is the best way to avoid a validation query and keep to that timescale.
How much do planning drawings cost in Bromley?+
We quote a fixed fee upfront, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Bromley approves. Because plots here allow larger schemes, the fee tracks the project's complexity — a single-storey rear differs from a double-storey or a green-belt case — and we confirm it once we understand your plans.
Free Fixed Quote

Get your free Hayes planning assessment

Tell us your Hayes (BR2) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.