MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportStructural Drawings in Teddington TW11

Rear extension to a Victorian terrace in Teddington, Richmond upon Thames (TW11)
Teddington · TW11 · Richmond

Structural Drawings in Teddington TW11

Fixed-fee, MCIAT-chartered structural drawings for Teddington (TW11) homeowners — London Borough of Richmond upon Thames validation and local constraints handled from the start.

Free Teddington planning assessment

Tell us your Teddington (TW11) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

TW11 is Teddington, midway between Twickenham and Hampton, a village-feel district of Victorian and Edwardian terraces where homeowners regularly weigh a rear extension, a side return or a loft conversion to add bedrooms and a bigger kitchen.

Several conservation areas overlap the outcode, from the High Street and Broad Street cores to Teddington Lock and Park Road, and with an Article 4 direction on Clarence Road a boundary check is essential before treating any scheme as permitted development.

Rear extension to a Victorian terrace in Teddington, Richmond upon Thames (TW11)
Isometric illustration of a Teddington TW11 home structural drawings design
Proposed floor plan
Teddington TW11

Planning in Teddington (TW11): what to know before you apply

Away from the conservation areas and Article 4 streets, many rear and loft projects proceed under permitted development within the usual limits. Inside a Teddington conservation area, or on Clarence Road where Article 4 applies, expect a full householder application for works to elevations, roofs or boundaries.

Typical Teddington housing stock

Teddington runs to Victorian and Edwardian terraces and semis on streets such as Manor Road and Cambridge Road, with the older village core and riverside cottages near Teddington Lock and larger villas towards Broom Water.

Streets we regularly draw for in Teddington

Manor Road · Cambridge Road · Watts Lane · Clarence Road

What TW11 is actually built of

Measured from 404 classified residential buildings in TW11, not from a description of the area.

Teddington TW11 housing mix

Residential building form across the TW11 postcode district, from 404 classified buildings.

Attached on more than one side42%
Attached on one side45%
Detached12%
Median building footprint70 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.76
Buildings classified404

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Structural Drawings for Teddington (TW11) homes: the package and the process

Structural sheets are issued to be built from. Beam and lintel schedules give size, grade and bearing; connection details show how each element meets the next; and padstones, straps and restraint are drawn at the junctions rather than noted in general terms. Calculations are submitted alongside so Building Control can check the design rather than take it on trust.

Coordination with the architectural set is where the value is. A beam that is right in isolation but sits below the approved ceiling line, or a column that lands in a doorway, is a site problem that costs more to fix than it did to draw. We resolve those clashes in the drawing stage.

The existing structure sets the design. A terrace transfers load through party walls that are shared and often unrecorded, a semi through one; and floor construction — timber, concrete, or a mix from earlier alterations — changes how a new opening is supported and what has to be exposed to find out.

Do I need structural calculations to remove a load-bearing wall in London?

If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.

How steel beam sizing works

A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.

How much do structural drawings cost in London?

Structural drawings and calculations start from £650 for a single beam or wall removal, agreed as a fixed fee before work begins. The price depends on the number of beams or walls involved, whether foundations need designing from scratch (as with a rear or side extension), whether existing floor and roof structures need checking for extra loading (as with most loft conversions), and whether retaining or underpinning calculations are required, as they are for basement conversions. Where structural work is part of a wider extension, loft or basement project, the structural calculation is typically bundled into the overall building regulations fee rather than charged again separately.

Typical structural drawing scope by project
Project scopeWhat's includedFee guide
Single beam or wall removalOne steel calculation plus a drawing showing beam size, padstones and bearingsFrom £650
Loft conversion structural packageFloor and roof loading checks, beam calculations, staircase opening designIncluded within loft drawings from £1,100
Rear or side extension structural packageFoundation design, steel beam calculations, roof loading checksIncluded within planning and building regs packages from £2,200–£3,850
Basement or retaining structureUnderpinning, retaining wall and waterproofing-adjacent structural calculationsQuoted individually — ground conditions vary
Sheet from a structural drawings package drawn for a Teddington property in TW11, showing the existing and proposed arrangement at scale
A sheet from the structural drawings package we submit to London Borough of Richmond upon Thames for Teddington (TW11) properties.
FAQ

Structural Drawings in Teddington TW11 — FAQs

Do I need a structural engineer to remove a wall in my London home?+
Yes, if the wall is load-bearing — which most internal walls between a kitchen and reception room are. We coordinate the structural calculation in-house alongside your drawings, so you do not need to find and brief a separate engineer yourself.
How long do structural calculations take?+
Structural drawings are typically ready within about 7 days of instruction, in line with the rest of our drawing packages, and are produced alongside your architectural and building regulations drawings so everything is issued together.
Will the steel beam on my drawings match what my builder orders?+
Yes — because we produce the architectural drawings and coordinate the structural calculation together, the beam size, position and bearings shown on your plans are the ones the calculation specifies, so there is nothing for your builder to reconcile on site.
Can you produce structural drawings without handling my full planning application?+
Yes, a standalone structural calculation is available if you already have architectural drawings and just need a wall or beam calculated and signed off for Building Control.
Do structural calculations need to be submitted to Building Control?+
Yes — a structural calculation is a required part of a Full Plans or Building Notice submission wherever a load-bearing wall, beam or foundation is involved, and Building Control will not approve the work without one.
Do I need planning permission for an extension in Richmond?+
More often than in most boroughs, yes. Richmond has some of the most extensive Article 4 coverage in London, so permitted development cannot be assumed even for modest works — many conservation areas such as Richmond Green, Teddington and Kew Green require a full application. We confirm the exact designation for your address first and design accordingly rather than relying on permitted development.
My Richmond home is near the river — does flood risk affect my application?+
It can. Much of the borough lies within the Thames flood zone, and the council expects flood-risk considerations to be addressed for works near the river in Twickenham, Richmond and Hampton. We evidence flood-risk and finished-floor-level considerations within the application so the council can validate and approve without repeated revisions.
What does Richmond's Article 4 coverage mean in practice?+
Article 4 directions remove permitted development rights across many of Richmond's conservation areas, so alterations that would be automatic elsewhere — dormers, cladding, some rear works — need a full householder application here. We design context-led drawings that respond to the borough's period townscape and river frontage, which is what carries an application to consent in Richmond.
How long does Richmond Council take to decide?+
Richmond determines most householder applications within the statutory eight-week period once validated, though conservation and riverside cases can attract additional consultation. Because so much turns on design detail here, we prepare submissions to the validation checklist with the elevations and materials the council expects, to avoid drawing queries.
How much do planning drawings cost in Richmond?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Richmond approves. Conservation and flood-zone cases require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Teddington planning assessment

Tell us your Teddington (TW11) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.