MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Drawings in Hillingdon UB10

Loft conversion with skylights in a 1930s Hillingdon UB10 semi-detached house
Hillingdon · UB10 · Hillingdon

Planning Drawings in Hillingdon UB10

Fixed-fee, MCIAT-chartered planning drawings for Hillingdon (UB10) homeowners — London Borough of Hillingdon validation and local constraints handled from the start.

Free Hillingdon planning assessment

Tell us your Hillingdon (UB10) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

UB10 spans two distinct worlds: the historic village cores of Ickenham and Hillingdon Village, and the large belt of 1930s suburban semis and detached houses around them where most rear and loft projects happen. On the suburban stock the design conversation is about matching established roofline and frontage patterns, which Hillingdon's guidance sets out clearly.

Inside either village conservation area the emphasis shifts to protecting period character around St Giles and St John the Baptist churches, so materials, rooflines and boundary treatments face tighter control. Because the two conservation-area boundaries are compact, we confirm exactly where a UB10 property falls before choosing a permitted-development or full-application route.

Loft conversion with skylights in a 1930s Hillingdon UB10 semi-detached house
Isometric illustration of a Hillingdon UB10 home planning drawings design
Proposed floor plan
Hillingdon UB10

Planning in Hillingdon (UB10): what to know before you apply

Most UB10 householder work sits on interwar suburban housing outside the conservation areas, where Hillingdon has well-established expectations for rear depth, side returns and dormers. The Ickenham Village and Hillingdon Village conservation areas are the exceptions — there, heritage-led design and usually a full application are the right approach.

Typical Hillingdon housing stock

Two protected village centres — Ickenham around St Giles Church and Hillingdon Village around St John the Baptist — of period cottages and Victorian houses, ringed by the substantial 1930s semi-detached and detached suburban stock that makes up most of the wider UB10 postcode.

Streets we regularly draw for in Hillingdon

Swakeleys Road · Austin's Lane · Royal Lane · Vine Lane

What UB10 is actually built of

Measured from 318 classified residential buildings in UB10, not from a description of the area.

Hillingdon UB10 housing mix

Residential building form across the UB10 postcode district, from 318 classified buildings.

Attached on more than one side28%
Attached on one side46%
Detached27%
Median building footprint71 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.13
Buildings classified318

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Planning Drawings for Hillingdon (UB10) homes: the package and the process

A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.

We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.

The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.

What is included in a planning drawing set?

A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.

  • Site location plan (1:1250) and block plan (1:500)
  • Existing floor plans, elevations and sections
  • Proposed floor plans, elevations and sections
  • Roof plans where relevant, with heights and materials annotated
  • A design and access or heritage statement where the borough requires one

How are planning drawings different from building regulations drawings?

Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.

How quickly can you produce planning drawings in London?

After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.

What a London planning drawing set contains
DrawingTypical scaleWhat it shows
Site location plan1:1250The property in its street context, site edged red
Block plan1:500The building's footprint and position in the plot
Floor plans (existing & proposed)1:100 / 1:50Room layout, walls, openings and the proposed changes
Elevations (existing & proposed)1:100 / 1:50Each face of the building and how it changes
Sections1:100 / 1:50A cut through showing heights, levels and roof form
Sheet from a planning drawings package drawn for a Hillingdon property in UB10, showing the existing and proposed arrangement at scale
A sheet from the planning drawings package we submit to London Borough of Hillingdon for Hillingdon (UB10) properties.
FAQ

Planning Drawings in Hillingdon UB10 — FAQs

What scale should London planning drawings be?+
Site location plans are 1:1250, block plans 1:500, and floor plans, elevations and sections are typically 1:100 or 1:50. We format every drawing to your specific borough's requirements.
Do I need an architect to produce planning drawings?+
No. MCIAT-chartered architectural technologists produce the same council-accepted planning drawings with the same professional accountability, and councils assess the drawings, not the author's job title.
How many revisions are included in the fee?+
All of them. The fee is fixed and we redraw free until your council approves — revisions requested by a planning officer never cost you extra.
Can you draw from my existing plans?+
We can work from existing measured drawings, but for accuracy we usually carry out a laser survey so the proposed set matches your property exactly.
Do planning drawings guarantee approval?+
No drawing can guarantee a decision, but drawing to the local plan and validation checklist maximises your odds — and we redraw free until approval.
Do I need planning permission for a loft conversion in Hillingdon?+
Hillingdon's Metro-land semis and detached houses in Ruislip, Eastcote and Ickenham suit hip-to-gable and dormer lofts, which frequently qualify as permitted development within the volume limits. The exceptions are the conservation areas — Ruislip Village, Uxbridge and Northwood — and green-belt land toward the Colne Valley. We check your address and can confirm permitted development with a Lawful Development Certificate.
How does the Colne Valley green belt affect my Hillingdon project?+
On green-belt properties toward the western edge of the borough, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
Does proximity to Heathrow affect my plans?+
It can toward the south of the borough, where aircraft-noise considerations may influence habitable-room and glazing design. We evidence these considerations within the application where they apply so the council can validate and approve without repeated revisions.
How long does Hillingdon Council take to decide?+
Hillingdon determines most householder applications within the statutory eight-week period once validated; green-belt and conservation cases can involve additional consultation. We prepare Hillingdon submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Hillingdon?+
We work to a fixed fee agreed upfront, usually around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Hillingdon approves. A dormer loft, a suburban extension and a green-belt case differ in the evidence required, so we confirm the fee once we understand your project rather than billing by the hour.
Free Fixed Quote

Get your free Hillingdon planning assessment

Tell us your Hillingdon (UB10) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.