MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportDouble Storey Extension Drawings in Merton

Rear extension opening onto a suburban garden, typical of a Merton Raynes Park or Wimbledon family-home project
Merton · London

Double Storey Extension Drawings in Merton

Fixed-fee, MCIAT-chartered double storey extension drawings for Merton homeowners — London Borough of Merton validation and local constraints handled from the start.

Free Merton planning assessment

Tell us your Merton address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Merton runs from the sought-after Victorian villas and terraces of Wimbledon Village and South Wimbledon and the planned John Innes estate at Merton Park down through the interwar semis of Raynes Park and Morden to the historic Cricket Green at Mitcham and the streets of Colliers Wood. Loft conversions and rear extensions are the borough's signature projects, with strong conservation control around Wimbledon and Merton Park tightening design where it applies.

The character shifts across the borough. Conservation areas at Wimbledon Village, Wimbledon Common, the John Innes estate at Merton Park, Mitcham Cricket Green, Colliers Wood and Wimbledon West Side control materials, rooflines and front elevations, and the John Innes estate's distinctive Arts-and-Crafts character is protected especially closely, with permitted development often restricted there. Article 4 directions remove permitted development for HMO conversions in designated wards, and toward Raynes Park and Morden the council expects extensions to respect the consistent interwar building lines. Those interwar semis, however, frequently retain permitted development rights for rear extensions and lofts.

We prepare Merton planning drawings that respect the character of the specific area — the Arts-and-Crafts detailing of Merton Park, the villa streets of Wimbledon, and the suburban lines of Raynes Park and Morden — checking permitted development eligibility and any Article 4 or conservation constraint first. It is the same council-accepted drawing set an architect would produce, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the London Borough of Merton approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the outset.

Rear extension opening onto a suburban garden, typical of a Merton Raynes Park or Wimbledon family-home project
Isometric illustration of a Merton home extension design
Proposed floor plan
Merton

Planning in Merton: what to know before you apply

Merton applies Article 4 directions to HMO conversions in designated wards and controls design within conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park. For the borough's interwar semis around Raynes Park and Morden, rear extensions and lofts frequently qualify as permitted development — we confirm before drawing.

Typical Merton housing stock

Victorian and Edwardian villas and terraces around Wimbledon and South Wimbledon, the planned Arts-and-Crafts John Innes estate at Merton Park, and interwar semi-detached suburbia through Raynes Park, Morden and Mitcham.

Areas we regularly draw for in Merton

Wimbledon · Mitcham · Morden · Raynes Park · Colliers Wood · Merton Park · South Wimbledon · Wimbledon Village

What the numbers say about Merton planning decisions

These are London Borough of Merton’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Permitted development in Merton

Larger householder extensions put to London Borough of Merton under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application321
Prior approval granted40
Prior approval refused179
Granted where a decision was neededFrom 219 determinations18%
Building upwards, prior approval refused0
Certificates of lawful development decided156

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

What removes permitted development in Merton

Live entries on the national planning registers for London Borough of Merton. Article 4 directions withdraw permitted development rights, so a project inside one needs a full application rather than prior approval. Revoked and expired entries are excluded.

Conservation areasPermitted development is already narrower inside one28

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

Double Storey Extension Drawings for Merton homes: the package and the process

At first-floor level the drawings have to answer for daylight, privacy and massing. That means proposed elevations showing every new window with its position relative to the boundary, a section taken through the extension and the neighbouring building, and a roof form drawn to sit below the existing ridge rather than compete with it.

We draw the neighbouring property alongside your own, because the officer's assessment is comparative — the effect on their windows and outlook is the test. Setting the first floor in from the boundary, and showing that set-back as a dimension, resolves most objections before consultation begins.

At first floor the boundary relationship decides everything. A detached house has room to set the addition in on both sides; a semi has one shared wall and one clear flank; a mid-terrace can usually only go to the rear, where the effect on both neighbours has to be drawn.

Do I need planning permission for a double storey extension in London?

Almost always. Permitted development rights for two-storey extensions are far more restrictive than for single-storey work, particularly on how close the new structure can come to a boundary and how closely its roof pitch and eaves height must match the existing house, so most double storey projects are drawn and submitted as full householder planning applications rather than relying on permitted development.

Where the property sits in a conservation area or is subject to an Article 4 direction, any remaining permitted development allowance for a second storey is typically removed entirely, reinforcing the need for a full application. We check your property's status and your borough's design guidance before drawing.

How do councils control the impact of a double storey extension on neighbours?

Because a second storey introduces new windows and massing at first-floor level, London boroughs apply design guidance aimed specifically at protecting neighbouring light, privacy and outlook.

  • The 45-degree rule, tested at neighbouring windows, to check the extension does not block an unreasonable amount of daylight
  • A common design expectation that a two-storey side extension is set in roughly 1 metre from the shared boundary, rather than built hard against it
  • A first floor commonly set back from the ground floor front elevation, so the upper storey reads as subordinate to the main house from the street
  • Obscure or high-level glazing on flank walls facing directly into a neighbour's garden or windows, to limit overlooking

Matching the roofline and materials

Planning officers assess a double storey extension heavily on how convincingly it reads as part of the original house rather than an addition bolted onto the side. Our drawings match ridge height, roof pitch, eaves detail and brick or render finish to the existing building wherever the design brief allows, which is consistently one of the strongest factors in securing approval without delay or redesign. Where a subtly contrasting material is proposed instead — a different brick tone, or a zinc or slate roof against a tiled original — we set it out clearly on the elevations so the design intent reads as deliberate rather than a mismatch, which is how most London boroughs prefer a genuine design statement to be presented.

Extending once vs twice: single versus double storey
OptionWhat it addsTypical fee
Single-storey rear extensionA ground-floor kitchen-diner only, may qualify for permitted developmentsee Rear Extension Drawings, from £1,100
Double storey side or rear extensionTwo rooms across two floors, usually needs full planningFull Planning pack ~£1,600–£2,400
Double storey + Building Regulations (structural)Combined pack including structural calculations for two-floor loads and foundationsPlanning + Building Regs pack ~£2,200–£3,850
Wraparound (rear + side return)Combines two single-storey extensions into one L-shaped ground floorsee Wraparound Extension Drawings, from £2,200
Sheet from a double storey extension drawings package prepared for a Merton property, drawn to London Borough of Merton validation standards
A sheet from the double storey extension drawings package we submit to London Borough of Merton.
FAQ

Double Storey Extension Drawings in Merton — FAQs

How much does a double storey extension cost to design in London?+
Double storey extension drawings start from £2,400, covering full planning permission and structural design for the additional floor. A combined planning and building regulations package with full structural calculations runs up to around £3,850, fixed and agreed upfront.
Do I need planning permission to add a second storey?+
In almost all cases, yes. Permitted development rights for two-storey extensions are much tighter than for single-storey work, particularly around boundary distance and roof matching, so we design double storey projects on the assumption a full householder planning application is required.
Will a double storey extension overlook my neighbour's garden?+
That is exactly what planning officers check, using the 45-degree daylight rule alongside boundary set-in and first-floor set-back guidance. Where a new flank window would look directly into a neighbour's garden, we typically specify obscure or high-level glazing to address it before submission rather than after an objection.
Do I need an architect for a double storey extension?+
No. DrawingsDirect is an MCIAT-chartered architectural technologist practice, producing the same council-accepted drawings and in-house structural coordination as an architect, for a fixed fee typically around 30% lower, with structural calculations for the additional floor produced by the same team rather than a separately appointed engineer.
How long does it take to get double storey extension drawings?+
Drawings are typically ready around 7 days from survey. A householder planning application then has a statutory 8-week determination period once submitted.
Do I need planning permission for an extension in Merton?+
The interwar semis of Raynes Park and Morden often keep permitted development rights for rear extensions and lofts, so a full application isn't always needed. Conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate.
What is special about building at the John Innes estate in Merton Park?+
The John Innes estate is a planned Arts-and-Crafts conservation area with a distinctive character the council protects closely — materials, proportions and rooflines are all controlled. Permitted development is often restricted there, so we design to the estate's character and prepare a full, context-led application, which is the reliable route to approval.
What do Merton's HMO Article 4 directions affect?+
In designated wards, an Article 4 direction removes permitted development for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application there. It doesn't affect a standard family extension, but if you are considering an HMO we confirm whether the direction covers your address and use before advising.
How long does Merton Council take to decide?+
Merton determines most householder applications within the statutory eight-week period once validated; Wimbledon and Merton Park conservation cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Merton?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Merton approves. A suburban Raynes Park extension and a Wimbledon Village or Merton Park application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Merton planning assessment

Tell us your Merton address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.