
Building Regulations Drawings in Thames View IG11
Fixed-fee, MCIAT-chartered building regulations drawings for Thames View (IG11) homeowners — London Borough of Barking and Dagenham validation and local constraints handled from the start.
Thames View (IG11) is a cohesive 1950s London County Council overspill estate, built on former marshland south of Barking town centre as a planned postwar community of low-rise council-built houses and blocks. That open, uniform estate layout — quite distinct from the borough's older terraced streets — is what shapes nearly every householder project here, so an extension has to sit comfortably within a very consistent, planned streetscape.
There is no conservation area covering Thames View — that is a genuine, verified fact, not an omission. Its planning character is shaped instead by the sheer uniformity of the estate layout and by Barking and Dagenham's householder design expectations, which lean on keeping the original postwar rhythm, materials and building lines intact. We treat that estate cohesion, rather than a conservation designation, as the reference point when we design an extension.
Because so many Thames View houses passed into private ownership after Right to Buy, demand for rear extensions, side infills and loft conversions is steady across streets like Bastable Avenue, Maplestead Road and Moore Crescent. We check each property's permitted-development position against Barking and Dagenham's borough-wide controls first, then prepare drawings that either stay within permitted development or are ready to validate as a full householder application.


Planning in Thames View (IG11): what to know before you apply
Because the estate is so uniform, Barking and Dagenham assess extensions on Thames View houses against the consistent postwar street pattern, so matching brick, render and roof form matters more than on a mixed-typology road. There is no conservation area and no estate-specific Article 4 direction, so many houses retain permitted development rights for rear and loft work — but the open estate layout, shared building lines and low-lying former-marshland ground mean spacing, neighbour impact and drainage are the points an application turns on.
Typical Thames View housing stock
Cohesive 1950s council-built houses and low-rise blocks arranged on a planned, open postwar layout, many now privately owned following Right to Buy — which is what drives the steady flow of rear-extension and loft-conversion work across the estate.
Streets we regularly draw for in Thames View
Bastable Avenue · River Road · Renwick Road · Choats Road · Upney Lane · Stamford Road · Aconbury Road · Pinley Gardens · Burnham Road · Maplestead Road · Castle Road · Moore Crescent
What IG11 is actually built of
Measured from 261 classified residential buildings in IG11, not from a description of the area.
Thames View IG11 housing mix
Residential building form across the IG11 postcode district, from 261 classified buildings.
| Attached on more than one side | 60% |
|---|---|
| Attached on one side | 38% |
| Detached | 2% |
| Median building footprint | 59 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.92 |
| Buildings classified | 261 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Building Regulations Drawings for Thames View (IG11) homes: the package and the process
A Full Plans submission is a technical argument, not a picture. The sheets carry construction build-ups for floors, walls and roof, insulation values and junction details, drainage runs and invert levels, fire escape routes and protected stairs, ventilation provision and the structural elements that carry it all. Building Control checks each against the Approved Documents before work starts.
We coordinate the structural design with the architectural sheets in-house, so the beam sizes on the calculations are the beam sizes on the sections, and the openings your builder prices are the openings that were approved. Where a detail is unusual, we draw it rather than leave it to be resolved on site.
Construction details follow the existing fabric. Solid brick walls, suspended timber floors and uninsulated roofs each need a different build-up to reach the required performance, and a terrace has party wall junctions to detail that a detached house simply does not.
What do building regulations drawings cover?
A building control package translates the approved design into a buildable, compliant specification.
- Construction sections and detailed junctions
- Structural drawings and calculations (steel beams, foundations, loadings)
- Part L thermal performance and insulation specification
- Fire safety — escape routes, protected structure, alarms
- Drainage and ventilation layouts
Full Plans or Building Notice — which should I choose?
A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly. Building regulations are a separate consent from planning permission, and the two are often confused — the explainer on permitted development rights sets out which projects escape a planning application but still need building-regs approval, and Architectural Drawings covers the same building-regs package where you want a chartered practice to carry it through to sign-off.
Why coordinate structural calculations in-house?
When the same team draws the building and calculates its structure, the steel schedule matches the drawings and the builder never waits on a missing detail. It removes the classic gap between an architect's drawings and a separately-appointed engineer's calculations.
| Factor | Full Plans | Building Notice |
|---|---|---|
| Drawings checked before work starts | Yes | No |
| Up-front certainty | High — approval in writing | Lower — inspected as built |
| Best for | Extensions, lofts, structural work | Minor, simple works |
| Evidence for lenders and buyers | Full approval record | Completion certificate only |
| Risk of costly on-site rework | Low | Higher if issues are found late |

Building Regulations Drawings in Thames View IG11 — FAQs
Do I need building regulations approval as well as planning permission?+
How long does Building Control approval take?+
Can building regulations drawings be done after planning approval?+
Are structural calculations included?+
Can you submit to Building Control for me?+
Do I need planning permission to extend a house in Thames View?+
Is Thames View in a conservation area?+
How much do planning and building-regulation drawings cost for a Thames View extension?+
How long does Barking & Dagenham Council take to decide?+
Get your free Thames View planning assessment
Tell us your Thames View (IG11) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.