MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportBuilding Regulations Drawings in Custom House E16

Rear extension and loft project on a dockside terraced house in Custom House E16, in the Royal Docks area of Newham
Custom House · E16 · Newham

Building Regulations Drawings in Custom House E16

Fixed-fee, MCIAT-chartered building regulations drawings for Custom House (E16) homeowners — London Borough of Newham validation and local constraints handled from the start.

Free Custom House planning assessment

Tell us your Custom House (E16) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Custom House (E16) grew as Victorian dock-worker housing around the Royal Victoria Dock, which opened in 1855, and now sits inside the Royal Docks regeneration and Enterprise Zone. Surviving and postwar-rebuilt terraces sit alongside major new-build development around the ExCeL and the Elizabeth line, so householder work here is largely extensions and lofts on the terraced houses that line the residential streets.

There is no conservation area covering the Custom House part of E16 — that is a genuine, verified fact, not an omission. Its planning character is instead shaped by the working dockside terraced grain and the surrounding regeneration, and by the London Borough of Newham's householder design expectations, which lean on keeping original building lines, materials and roof continuity intact. We treat that terraced character, rather than a conservation designation, as the reference point when we design an extension.

Demand for rear extensions and loft conversions runs steadily across residential streets like Tollgate Road, Rogers Road and Chadwin Road, where compact terraced houses sit on modest plots. We check each property's permitted-development position against Newham's borough-wide controls first — and any surface-water drainage points given the low-lying dockside land — then prepare drawings that either stay within permitted development or are ready to validate as a full householder application.

Rear extension and loft project on a dockside terraced house in Custom House E16, in the Royal Docks area of Newham
Isometric illustration of a Custom House E16 home building regulations drawings design
Proposed floor plan
Custom House E16

Planning in Custom House (E16): what to know before you apply

Because Custom House is a dockside mix of surviving and rebuilt terraces set within the Royal Docks regeneration area, Newham assess extensions against the prevailing rhythm and building line of the individual residential street, so matching original brick, roof continuity and neighbour relationships matters alongside the numbers. There is no conservation area and no local Article 4 direction in the Custom House part of E16, so many terraced houses retain permitted development rights for rear and loft work — but compact plots, shared party walls and low-lying land mean depth, height, neighbour impact and drainage are the points a householder application is judged on.

Typical Custom House housing stock

A mix of surviving and postwar-rebuilt terraced housing with substantial new-build apartments across the Royal Docks regeneration area. It is the terraced houses on the residential streets, rather than the apartment blocks, that generate most of the rear-extension and loft-conversion work here.

Streets we regularly draw for in Custom House

Barrier Point Road · Tollgate Road · Rayleigh Road · Wesley Avenue · Rogers Road · Ruscoe Road · Egham Road · Chadwin Road · Cranley Road · Selby Road · Caraway Close · Eclipse Road

What E16 is actually built of

Measured from 274 classified residential buildings in E16, not from a description of the area.

Custom House E16 housing mix

Residential building form across the E16 postcode district, from 274 classified buildings.

Attached on more than one side68%
Attached on one side27%
Detached4%
Median building footprint50 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate2.42
Buildings classified274

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Building Regulations Drawings for Custom House (E16) homes: the package and the process

A Full Plans submission is a technical argument, not a picture. The sheets carry construction build-ups for floors, walls and roof, insulation values and junction details, drainage runs and invert levels, fire escape routes and protected stairs, ventilation provision and the structural elements that carry it all. Building Control checks each against the Approved Documents before work starts.

We coordinate the structural design with the architectural sheets in-house, so the beam sizes on the calculations are the beam sizes on the sections, and the openings your builder prices are the openings that were approved. Where a detail is unusual, we draw it rather than leave it to be resolved on site.

Construction details follow the existing fabric. Solid brick walls, suspended timber floors and uninsulated roofs each need a different build-up to reach the required performance, and a terrace has party wall junctions to detail that a detached house simply does not.

What do building regulations drawings cover?

A building control package translates the approved design into a buildable, compliant specification.

  • Construction sections and detailed junctions
  • Structural drawings and calculations (steel beams, foundations, loadings)
  • Part L thermal performance and insulation specification
  • Fire safety — escape routes, protected structure, alarms
  • Drainage and ventilation layouts

Full Plans or Building Notice — which should I choose?

A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly. Building regulations are a separate consent from planning permission, and the two are often confused — the explainer on permitted development rights sets out which projects escape a planning application but still need building-regs approval, and Architectural Drawings covers the same building-regs package where you want a chartered practice to carry it through to sign-off.

Why coordinate structural calculations in-house?

When the same team draws the building and calculates its structure, the steel schedule matches the drawings and the builder never waits on a missing detail. It removes the classic gap between an architect's drawings and a separately-appointed engineer's calculations.

Full Plans vs Building Notice for a London project
FactorFull PlansBuilding Notice
Drawings checked before work startsYesNo
Up-front certaintyHigh — approval in writingLower — inspected as built
Best forExtensions, lofts, structural workMinor, simple works
Evidence for lenders and buyersFull approval recordCompletion certificate only
Risk of costly on-site reworkLowHigher if issues are found late
Sheet from a building regulations drawings package drawn for a Custom House property in E16, showing the existing and proposed arrangement at scale
A sheet from the building regulations drawings package we submit to London Borough of Newham for Custom House (E16) properties.
FAQ

Building Regulations Drawings in Custom House E16 — FAQs

Do I need building regulations approval as well as planning permission?+
Almost always, yes. Planning permission covers what the building looks like; building regulations cover how safely it is built. Most extensions and loft conversions need both.
How long does Building Control approval take?+
A Full Plans application is typically assessed within about five weeks. We prepare a complete package and respond to any conditions promptly, so approval is not held up by missing detail.
Can building regulations drawings be done after planning approval?+
Yes. Many homeowners secure planning permission first, then commission the building regulations package before starting on site. We can pick a project up at either stage.
Are structural calculations included?+
Yes — we produce structural drawings and calculations in-house as part of the building regulations package, so your builder has everything to price and build.
Can you submit to Building Control for me?+
Yes, we prepare and submit the Full Plans package and respond to any Building Control queries.
Do I need planning permission to extend a house in Custom House?+
Not always. Many Custom House terraced houses retain permitted development rights, so a modest single-storey rear extension or a rear loft conversion can often proceed without a full planning application. Because the terraced plots are compact and sit on low-lying dockside land, we check your property's size limits, party-wall lines and any drainage points against Newham's controls first, and prepare a full householder application where the project goes beyond permitted development.
Is Custom House in a conservation area?+
No. There is no conservation area covering the Custom House part of E16. Its planning character is shaped instead by the working dockside terraced grain, the surrounding Royal Docks regeneration and Newham's householder design expectations, which favour keeping original building lines, materials and roof continuity intact when you extend.
How much do planning and building-regulation drawings cost for a Custom House extension?+
We work to fixed fees agreed before we start, with a typical turnaround of around seven days for a standard rear extension or loft on a Custom House terraced house. As a chartered architectural technologist practice we produce the same council-accepted planning and building-regulation drawings as an architect, usually for a lower fee, and include free redraws until your application is approved.
How long does Newham Council take to decide?+
Newham determines most householder applications within the statutory eight-week period once validated; conservation cases can attract additional consultation. The dense terraced streets are party-wall-sensitive, so the commonest delay is a drawing query — we prepare submissions to the council's householder guidance to keep them moving.
Free Fixed Quote

Get your free Custom House planning assessment

Tell us your Custom House (E16) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.