MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Perivale UB6

Loft conversion with rear dormer on a 1930s Perivale semi UB6, drawings for Ealing Council planning
Perivale · UB6 · Ealing

Planning Permission in Perivale UB6

Fixed-fee, MCIAT-chartered planning permission for Perivale (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.

Free Perivale planning assessment

Tell us your Perivale (UB6) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Perivale (UB6) is a well-preserved 1930s suburb of matching semis on curving avenues, where the bread-and-butter work is rear kitchen extensions, hip-to-gable loft conversions and rear dormers. The uniformity of the streetscape means Ealing's officers care about how a proposal reads against its neighbours, so faithful detailing matters more here than in a mixed-age street.

Perivale also sits in the orbit of the Art Deco Hoover Building on Western Avenue and the green ridge of Horsenden Hill, and the Canalside conservation area clips its north-west edge. We design extensions that echo the original bay, render and roof pitch, and we check tree cover and the canal-side boundary so schemes reach Ealing's approval standard first time.

Loft conversion with rear dormer on a 1930s Perivale semi UB6, drawings for Ealing Council planning
Isometric illustration of a Perivale UB6 home planning permission design
Proposed floor plan
Perivale UB6

Planning in Perivale (UB6): what to know before you apply

No published householder Article 4 direction in Perivale, so most householder work proceeds under permitted development or a standard Ealing application. Homes near the Canalside conservation area or backing onto Horsenden Hill's open space face tighter scrutiny on materials, roof form and tree protection.

Typical Perivale housing stock

Perivale is a planned interwar suburb of consistent 1930s semis and short terraces, many with curved bays, rendered gables and hipped tiled roofs, arranged on gently curving crescents. Streets rising towards Horsenden Hill keep deep rear gardens well suited to single-storey extensions and loft dormers.

Streets we regularly draw for in Perivale

Bilton Road · Horsenden Lane South · Conway Crescent · Calder Avenue

What UB6 is actually built of

Measured from 299 classified residential buildings in UB6, not from a description of the area.

Perivale UB6 housing mix

Residential building form across the UB6 postcode district, from 299 classified buildings.

Attached on more than one side44%
Attached on one side54%
Detached2%
Median building footprint62 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.52
Buildings classified299

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Planning Permission for Perivale (UB6) homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package drawn for a Perivale property in UB6, showing the existing and proposed arrangement at scale
A sheet from the planning permission package we submit to London Borough of Ealing for Perivale (UB6) properties.
FAQ

Planning Permission in Perivale UB6 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for a rear extension in Ealing?+
Many Ealing semis and terraces keep permitted development rights for a single-storey rear extension, so a full application isn't always needed. But the borough-wide Article 4 direction on HMO conversions, and conservation areas such as Bedford Park and Pitshanger, remove or restrict those rights in places. We check your address against the designations first and, where it qualifies, confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. A standard permitted-development dormer or cladding change usually won't apply; instead we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects — the reliable route to approval there.
How long does Ealing Council take to decide a householder application?+
Ealing determines most householder applications within the statutory eight-week period once they are validated. The commonest cause of delay is a validation query over missing or inconsistent drawings, so we prepare Ealing submissions to the council's validation checklist — correctly scaled existing and proposed plans, elevations and a location plan — to avoid that back-and-forth.
Can you help with a loft conversion on a 1930s Ealing semi?+
Yes. Ealing's Metro-land semis in Perivale, Greenford and Northolt suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development on semi-detached homes within the volume limits. We confirm eligibility against those limits and any Article 4 or conservation constraint, then produce the planning and building-regulations drawings.
How much do planning drawings cost in Ealing?+
We work to a fixed fee agreed before we start, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing grants approval. The exact figure depends on the project — a single-storey rear extension differs from a double-storey or a loft — so we quote once we understand your scheme rather than on an open-ended hourly basis.
Free Fixed Quote

Get your free Perivale planning assessment

Tell us your Perivale (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.