
Architectural Drawings in Greenwich SE10
Fixed-fee, MCIAT-chartered architectural drawings for Greenwich (SE10) homeowners — Royal Borough of Greenwich validation and local constraints handled from the start.
Greenwich (SE10) is among the most heritage-sensitive places to build in London: most of its period housing sits within one of the Royal Borough's conservation areas — West Greenwich, Greenwich Park, East Greenwich or the Ashburnham Triangle — and three of those carry Article 4 directions that pull nearly all external work into the planning system. Side-return and rear extensions on the Victorian and Georgian terraces are the staple, but they are judged carefully on materials, proportion and detail.
SE10 also sits within, or beside, the Maritime Greenwich World Heritage Site: the inscribed core is the Old Royal Naval College, Queen's House, Royal Observatory and Cutty Sark, with the surrounding streets in the buffer zone. That means townscape and setting weigh heavily on how schemes are assessed. We check exactly which conservation area — and which Article 4 direction — applies to a Greenwich address before advising on a permitted-development or full-application route.


Planning in Greenwich (SE10): what to know before you apply
Most SE10 houses fall inside the West Greenwich, Greenwich Park, East Greenwich or Ashburnham Triangle conservation areas, and the first three carry Article 4 directions removing permitted-development rights for re-roofing, windows, doors and other external changes. The Maritime Greenwich World Heritage Site and its buffer zone add further townscape scrutiny. We confirm the conservation area and Article 4 status for a specific property before recommending a route and drawing to the Royal Borough's guidance.
Typical Greenwich housing stock
Georgian and early-Victorian terraces around Royal Hill and Crooms Hill, the Victorian terraces of the Ashburnham Triangle, and the streets of West and East Greenwich framing the town centre and Greenwich Park.
Streets we regularly draw for in Greenwich
Royal Hill · Crooms Hill · Ashburnham Grove · Gloucester Circus
What SE10 is actually built of
Measured from 310 classified residential buildings in SE10, not from a description of the area.
Greenwich SE10 housing mix
Residential building form across the SE10 postcode district, from 310 classified buildings.
| Attached on more than one side | 70% |
|---|---|
| Attached on one side | 26% |
| Detached | 4% |
| Median building footprint | 54 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 2.79 |
| Buildings classified | 310 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Architectural Drawings for Greenwich (SE10) homes: the package and the process
The full architectural package has to serve three audiences that want different things from the same building. Planning officers want context, massing and materials; Building Control wants construction, insulation and fire strategy; your builder wants dimensions precise enough to price and set out from. One coordinated model behind all three keeps them agreeing with each other.
That coordination is the part clients notice later. When the planning set and the construction set are drawn from separate sources, the discrepancies surface on site — a beam that will not fit the approved roof line, a window head that has moved. We issue numbered, revision-controlled sheets so everyone is building from the same version.
Building form also sets how much design work there is to do. A detached house can usually take an addition on its own terms, while a terrace has to negotiate two party walls, a shared roof line and a neighbour's windows — the same brief, several times the coordination.
What do architectural drawings include?
A complete architectural package carries your project from idea to buildable detail, so builders quote accurately and councils and Building Control approve confidently.
- Concept and feasibility sketches
- Planning drawings for the local authority
- Building regulations drawings with construction detail
- Structural drawings and calculations
- Schedules, specifications and material annotations
Architect or architectural technologist — which do I need in London?
For residential planning and building regulations work, an MCIAT-chartered technologist produces the same council-accepted drawings with the same professional accountability as an architect, typically at a lower fee. Councils do not score applications by the author's job title — they score the drawings. The table below compares the two on the factors homeowners actually care about.
What are the stages of an architectural drawing package?
A full architectural package moves through clear stages, each producing drawings you own and can act on. You can stop at any stage — many homeowners take a project to planning approval first, then commission the technical package once they are ready to build.
Concept and feasibility
Sketch options that test what your budget, plot and borough will allow, so you commit to a direction before detailed drawing begins.
Planning drawings
The scaled existing and proposed set your council assesses — floor plans, elevations, sections and site plans formatted to the borough's validation checklist.
Building regulations drawings
The construction-level package: sections, junction details, structural calculations and thermal and fire specification for Building Control.
Construction detail
The final layer of detail and schedules your builder prices and works from on site.
| Factor | Architectural Technologist | Architect |
|---|---|---|
| Council-accepted drawings | Yes | Yes |
| Typical fee | ~30% lower | Higher |
| Structural coordination | In-house | Often outsourced |
| Typical drawing turnaround | ~7 days | Several weeks |
| Best for | Extensions, lofts, conversions | Bespoke new-build design |

Architectural Drawings in Greenwich SE10 — FAQs
Are architectural drawings the same as planning drawings?+
Will a technologist's drawings be accepted by my council?+
Can you take my project all the way to construction?+
Do I own the architectural drawings you produce?+
Can I commission just the planning stage for now?+
Do I need planning permission for an extension in Greenwich?+
How does the Maritime Greenwich World Heritage Site affect my project?+
Can I extend a home in Blackheath or Westcombe Park?+
How long does the Royal Borough of Greenwich take to decide?+
How much do planning drawings cost in Greenwich?+
Get your free Greenwich planning assessment
Tell us your Greenwich (SE10) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.