
Planning Permission in Ealing
Fixed-fee, MCIAT-chartered planning permission for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.
Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.
The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.
We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.


Planning in Ealing: what to know before you apply
Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.
Typical Ealing housing stock
Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.
Areas we regularly draw for in Ealing
Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall
Planning Permission for Ealing homes: the package and the process
Every planning permission we prepare for a Ealing property is drawn to London Borough of Ealing’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission across Ealing
Planning Permission in Ealing — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Ealing planning assessment
Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.