
Planning Permission in Greenford UB6
Fixed-fee, MCIAT-chartered planning permission for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.
The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.


Planning in Greenford (UB6): what to know before you apply
No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.
Typical Greenford housing stock
Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.
Streets we regularly draw for in Greenford
Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue
Planning Permission for Greenford (UB6) homes: the package and the process
Every planning permission we prepare for an Greenford property is drawn to London Borough of Ealing’s validation standards and tuned to the UB6 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission in Greenford UB6 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Greenford planning assessment
Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.