MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportArchitectural Drawings in Ealing

Single-storey rear extension opening onto a London garden, a common Ealing family-home project
Ealing · London

Architectural Drawings in Ealing

Fixed-fee, MCIAT-chartered architectural drawings for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.

Free Ealing planning assessment

Tell us your Ealing address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.

The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.

We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.

Single-storey rear extension opening onto a London garden, a common Ealing family-home project
Isometric illustration of a Ealing home extension design
Proposed floor plan
Ealing

Planning in Ealing: what to know before you apply

Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.

Typical Ealing housing stock

Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.

Areas we regularly draw for in Ealing

Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall

Architectural Drawings for Ealing homes: the package and the process

Every architectural drawings we prepare for a Ealing property is drawn to London Borough of Ealing’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Architectural drawings are the overarching technical design for a building project — the master set from which planning drawings, building regulations drawings and construction details all flow. Where a planning application is one regulatory hurdle, the architectural drawing package is the complete design record of your home improvement.

DrawingsDirect provides that full service through MCIAT-chartered architectural technologists: the same professional, council-accepted output as an architecture practice, coordinated with structural engineering in-house, at a fixed fee.

What do architectural drawings include?

A complete architectural package carries your project from idea to buildable detail, so builders quote accurately and councils and Building Control approve confidently.

  • Concept and feasibility sketches
  • Planning drawings for the local authority
  • Building regulations drawings with construction detail
  • Structural drawings and calculations
  • Schedules, specifications and material annotations

Architect or architectural technologist — which do I need in London?

For residential planning and building regulations work, an MCIAT-chartered technologist produces the same council-accepted drawings with the same professional accountability as an architect, typically at a lower fee. Councils do not score applications by the author's job title — they score the drawings. The table below compares the two on the factors homeowners actually care about.

Chartered architectural technologist vs traditional architect for a London home project
FactorArchitectural TechnologistArchitect
Council-accepted drawingsYesYes
Typical fee~30% lowerHigher
Structural coordinationIn-houseOften outsourced
Typical drawing turnaround~7 daysSeveral weeks
Best forExtensions, lofts, conversionsBespoke new-build design
FAQ

Architectural Drawings in Ealing — FAQs

Are architectural drawings the same as planning drawings?+
Planning drawings are a subset of the architectural package — the drawings used specifically for a planning application. The architectural drawings also include building regulations and construction detail.
Will a technologist's drawings be accepted by my council?+
Yes. MCIAT-chartered technologists are a recognised professional body and their drawings are routinely accepted and approved by every London borough.
Can you take my project all the way to construction?+
Yes — from feasibility through planning, building regulations and structural detail, to a set your builder can price and build from.
Do I own the architectural drawings you produce?+
Yes. The drawings are yours to use, and any competent builder can price and build from them — you are never locked into a single contractor by the drawing package.
Can I commission just the planning stage for now?+
Yes. Many homeowners take a project to planning approval first and add the building regulations and construction package later. We stage the fee to match, so you only pay for the stage you need.
Do I need planning permission for a rear extension in Ealing?+
Many Ealing semis and terraces keep permitted development rights for a single-storey rear extension, so a full application isn't always needed. But the borough-wide Article 4 direction on HMO conversions, and conservation areas such as Bedford Park and Pitshanger, remove or restrict those rights in places. We check your address against the designations first and, where it qualifies, confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. A standard permitted-development dormer or cladding change usually won't apply; instead we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects — the reliable route to approval there.
How long does Ealing Council take to decide a householder application?+
Ealing determines most householder applications within the statutory eight-week period once they are validated. The commonest cause of delay is a validation query over missing or inconsistent drawings, so we prepare Ealing submissions to the council's validation checklist — correctly scaled existing and proposed plans, elevations and a location plan — to avoid that back-and-forth.
Can you help with a loft conversion on a 1930s Ealing semi?+
Yes. Ealing's Metro-land semis in Perivale, Greenford and Northolt suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development on semi-detached homes within the volume limits. We confirm eligibility against those limits and any Article 4 or conservation constraint, then produce the planning and building-regulations drawings.
How much do planning drawings cost in Ealing?+
We work to a fixed fee agreed before we start, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing grants approval. The exact figure depends on the project — a single-storey rear extension differs from a double-storey or a loft — so we quote once we understand your scheme rather than on an open-ended hourly basis.
Free Fixed Quote

Get your free Ealing planning assessment

Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.