
Planning Permission in Northolt UB5
Fixed-fee, MCIAT-chartered planning permission for Northolt (UB5) homeowners — London Borough of Ealing validation and local constraints handled from the start.
In Northolt (UB5) we prepare planning and building-control drawings for rear extensions, loft conversions and garage conversions on the district's 1930s semis and interwar homes.
Around the Northolt Village Green conservation area we check the boundary and the setting of nearby heritage buildings first, then advise whether your extension runs as permitted development or needs a full application.


Planning in Northolt (UB5): what to know before you apply
The bulk of 1930s UB5 housing sits outside the small Village Green conservation area and keeps full permitted-development rights for rear extensions and lofts. Plots near the green face conservation-area control on demolition, side extensions and anything affecting the historic setting.
Typical Northolt housing stock
Northolt centres on the historic Village Green around St Mary's Church and Court Farm Road, but the wider UB5 district is predominantly 1930s semi-detached and interwar suburban housing with good-sized rear gardens.
Streets we regularly draw for in Northolt
Ealing Road · Court Farm Road · Church Road · Islip Manor Road
Planning Permission for Northolt (UB5) homes: the package and the process
Every planning permission we prepare for an Northolt property is drawn to London Borough of Ealing’s validation standards and tuned to the UB5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission in Northolt UB5 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Northolt planning assessment
Tell us your Northolt (UB5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.