MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Bromley

Detached London brick house with garage and driveway, characteristic of Bromley's suburban plots
Bromley · London

Planning Permission in Bromley

Fixed-fee, MCIAT-chartered planning permission for Bromley homeowners — London Borough of Bromley validation and local constraints handled from the start.

Free Bromley planning assessment

Tell us your Bromley address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

As London's largest borough by area, Bromley offers the generous interwar detached and semi-detached plots that make substantial rear and double-storey extensions genuinely viable. The housing stock runs from suburban semis around Beckenham, Penge and West Wickham to larger detached homes and edge-of-London properties toward Orpington, Hayes and Chislehurst. The right Bromley application is usually about maximising a large plot within policy rather than squeezing a tight terrace, and the room to build is exactly why so many owners here extend rather than move.

Two constraints shape what is achievable. Green-belt designation across the borough's outer edges restricts the scale of additions on properties toward Orpington and Chislehurst, where extensions are assessed against strict limits on disproportionate additions to the original dwelling. Conservation control in Chislehurst, Keston, Hayes, Park Langley and Bromley Town governs materials and design in those areas. Bromley has no borough-wide Article 4 direction affecting typical householder permitted development, so detached homes here often retain fuller rights than inner-London terraces, which we always check first.

We prepare Bromley planning drawings that use the available plot fully while respecting green-belt and conservation constraints, confirming permitted development limits for detached and semi-detached homes before we draw and evidencing green-belt cases carefully where they apply. Because the plots allow larger schemes, we design to the project rather than a standard template, and we agree a fixed fee up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Bromley approves. The council determines most householder applications within the statutory eight-week period once validated, so a complete, correctly scaled, validation-first submission is the best way to hold that timescale.

Detached London brick house with garage and driveway, characteristic of Bromley's suburban plots
Isometric illustration of a Bromley home extension design
Proposed floor plan
Bromley

Planning in Bromley: what to know before you apply

Bromley has no borough-wide Article 4 direction affecting typical householder permitted development; the binding constraints are green-belt policy on outer properties and conservation-area control in Chislehurst, Keston and Bromley Town. Detached homes here often retain fuller permitted development rights than inner-London terraces.

Typical Bromley housing stock

Large interwar detached and semi-detached houses with generous plots, plus green-belt and edge-of-London properties toward Orpington and Chislehurst.

Areas we regularly draw for in Bromley

Bromley · Beckenham · Orpington · Chislehurst · Penge · Hayes · West Wickham

Planning Permission for Bromley homes: the package and the process

Every planning permission we prepare for a Bromley property is drawn to London Borough of Bromley’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.

Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
FAQ

Planning Permission in Bromley — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Bromley?+
Bromley has no borough-wide Article 4 direction affecting typical householder permitted development, so its detached and semi-detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify. The binding constraints are green-belt policy on outer properties and conservation control in Chislehurst, Keston and Bromley Town. We check both and can confirm permitted development with a Lawful Development Certificate.
Can I build a bigger extension because Bromley plots are larger?+
Often, yes. Bromley's generous interwar plots make substantial rear and double-storey extensions viable where an inner-London terrace could not accommodate them. The limit is usually policy rather than space — green belt restricts scale on outer properties, and conservation areas control design. We design to use the plot fully within those limits, checking permitted-development allowances for detached homes first.
How does green-belt designation affect my Bromley project?+
On green-belt properties toward Orpington, Chislehurst and the borough's edges, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
How long does Bromley Council take to decide?+
Bromley determines most householder applications within the statutory eight-week period once validated. As London's largest borough by area, its casework spans suburban semis to green-belt properties, so a complete, correctly scaled submission is the best way to avoid a validation query and keep to that timescale.
How much do planning drawings cost in Bromley?+
We quote a fixed fee upfront, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Bromley approves. Because plots here allow larger schemes, the fee tracks the project's complexity — a single-storey rear differs from a double-storey or a green-belt case — and we confirm it once we understand your plans.
Free Fixed Quote

Get your free Bromley planning assessment

Tell us your Bromley address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.