
Planning Permission in Ealing Broadway W5
Fixed-fee, MCIAT-chartered planning permission for Ealing Broadway (W5) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Ealing Broadway (W5) is the heart of 'Queen of the Suburbs' Ealing, and the housing reflects it — substantial Victorian and Edwardian villas climbing the hill north of the Broadway, with mansion flats and larger subdivided houses nearer the station. The scale of these plots means loft conversions, rear extensions and outbuildings are common, but so is the conservation-area control that shapes them.
Three conservation areas meet across the district: Mount Park on the higher ground to the north, Ealing Common to the east and Ealing Green to the south. Which one a property falls in changes what is achievable on the roof and front elevation, so we establish the boundary and the borough's guidance before recommending a permitted-development or full-application route.


Planning in Ealing Broadway (W5): what to know before you apply
W5 carries no borough-wide Article 4 direction affecting typical householder work, so many Ealing Broadway houses retain permitted development rights for rear and loft projects — but the Mount Park, Ealing Common and Ealing Green conservation areas are the significant exceptions, and the generous villa plots mean extensions are judged closely against neighbouring building and garden lines. London Borough of Ealing does not publish an Article 4 schedule to the national open-data register, so we verify the current position with the council before advising.
Typical Ealing Broadway housing stock
Large late-Victorian and Edwardian villas and semi-detached houses on the hill north of the Broadway, many on generous plots, alongside Edwardian mansion flats and subdivided family houses closer to the station.
Streets we regularly draw for in Ealing Broadway
Mount Park Road · Castlebar Road · The Mall · Grange Road · Uxbridge Road
Planning Permission for Ealing Broadway (W5) homes: the package and the process
Every planning permission we prepare for an Ealing Broadway property is drawn to London Borough of Ealing’s validation standards and tuned to the W5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission in Ealing Broadway W5 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Ealing Broadway planning assessment
Tell us your Ealing Broadway (W5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.