MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportHouse Extension Drawings in London

Rear extension opening onto a London garden with bi-fold doors
House Extension Drawings

House Extension Drawings in London | Fixed Fee

Rear, side-return, wraparound, double-storey and basement extensions, drawn to approve.

Get your fixed-fee quote

60 seconds now. A no-obligation fixed quote back within one working day — with a free planning appraisal.

No obligation · No spam · Reply within 1 working day
Open-plan London interior created by an approved house extension drawings project
Isometric illustration of a London home extension design
Proposed floor plan
MCIAT chartered

A well-drawn extension adds space and value while sailing through the council; a poorly-drawn one triggers objections and refusals. DrawingsDirect draws rear, side-return, wraparound, double-storey and basement extensions for London homes — sized to your borough's tolerances, with daylight and neighbour impact considered before the planners raise them.

Fixed fees from £1,100 · Drawings in ~7 days · Free redraws to approval.

Which extension types do you draw?

Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.

Rear extension

A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.

Side-return

Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.

Wraparound

Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.

Double-storey

Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.

Basement

Creates space downward where footprint is limited, with structural and party-wall care.

Do I need planning permission for a house extension in London?

Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing.

How do you maximise the footprint the council will approve?

We know each borough's depth, height and daylight standards, so we design to the edge of what will be approved rather than guessing — and we check the 45-degree neighbour daylight rule and any rear building line before submission. Where a plot is tight we test a permitted-development scheme against a slightly larger householder application and show you the trade-off in space, cost and timescale, so the drawn scheme is the one that actually maximises value rather than just floor area.

Typical London extension drawing packages
ExtensionTypical routePackageFee from
Single-storey rearPermitted development / householderPlanning + building regs£1,100
Side-returnHouseholder planningPlanning + building regs + structural£1,600
WraparoundHouseholder planningFull package + structural£2,200
Double-storeyHouseholder planningFull package + structural£2,400
By Borough

House Extension Drawings in your London borough

Local planning constraints, conservation areas and Article 4 notes for each council.

Browse all London boroughs
FAQ

House Extension Drawings — frequently asked questions

How far can I extend without planning permission in London?+
Under permitted development, single-storey rear extensions can reach 3m (terraced/semi) or 4m (detached), or up to 6–8m under the prior-approval larger-home scheme — but conservation areas and Article 4 directions can remove these rights. We check your property first.
Do extension drawings include structural calculations?+
Our full package includes structural drawings and calculations coordinated in-house, so your builder can price and build without waiting on an engineer.
How long do extension drawings take?+
Typically about 7 days from survey to a full drawing set delivered to your online portal.
Will my rear extension need a party wall agreement?+
If you build up to or on a shared boundary, excavate near a neighbour's foundations, or cut into a party wall for a steel, the Party Wall etc. Act 1996 usually applies. Our drawings show the works clearly so a party wall surveyor — or your neighbour — can see exactly what is proposed, which keeps that process quick.
Can I extend a house in a conservation area?+
Yes, but conservation areas and Article 4 directions commonly remove permitted development for rear and side extensions, so the work needs a full householder application designed to the council's heritage guidance. We confirm your property's designation before recommending a route.
Free Fixed Quote

Ready for house extension drawings that get approved?

Tell us your London address and project. We'll confirm feasibility and a fixed fee within one working day — with a free planning appraisal of your property's potential.