
Building Regulations Drawings in Ealing
Fixed-fee, MCIAT-chartered building regulations drawings for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.
Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.
The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.
We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.


Planning in Ealing: what to know before you apply
Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.
Typical Ealing housing stock
Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.
Areas we regularly draw for in Ealing
Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall
Building Regulations Drawings for Ealing homes: the package and the process
Every building regulations drawings we prepare for a Ealing property is drawn to London Borough of Ealing’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Where planning drawings gain design consent, building regulations drawings prove your project meets the technical standards for a safe, warm, structurally sound building. DrawingsDirect produces full-plans building control packages for London extensions, lofts and conversions, with structural calculations produced in-house rather than subcontracted.
What do building regulations drawings cover?
A building control package translates the approved design into a buildable, compliant specification.
- Construction sections and detailed junctions
- Structural drawings and calculations (steel beams, foundations, loadings)
- Part L thermal performance and insulation specification
- Fire safety — escape routes, protected structure, alarms
- Drainage and ventilation layouts
Full Plans or Building Notice — which should I choose?
A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly.
| Factor | Full Plans | Building Notice |
|---|---|---|
| Drawings checked before work starts | Yes | No |
| Up-front certainty | High — approval in writing | Lower — inspected as built |
| Best for | Extensions, lofts, structural work | Minor, simple works |
| Evidence for lenders and buyers | Full approval record | Completion certificate only |
| Risk of costly on-site rework | Low | Higher if issues are found late |
Building Regulations Drawings across Ealing
Building Regulations Drawings in Ealing — FAQs
Do I need building regulations approval as well as planning permission?+
How long does Building Control approval take?+
Can building regulations drawings be done after planning approval?+
Are structural calculations included?+
Can you submit to Building Control for me?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Ealing planning assessment
Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.