
Building Regulations Drawings in Northolt UB5
Fixed-fee, MCIAT-chartered building regulations drawings for Northolt (UB5) homeowners — London Borough of Ealing validation and local constraints handled from the start.
In Northolt (UB5) we prepare planning and building-control drawings for rear extensions, loft conversions and garage conversions on the district's 1930s semis and interwar homes.
Around the Northolt Village Green conservation area we check the boundary and the setting of nearby heritage buildings first, then advise whether your extension runs as permitted development or needs a full application.


Planning in Northolt (UB5): what to know before you apply
The bulk of 1930s UB5 housing sits outside the small Village Green conservation area and keeps full permitted-development rights for rear extensions and lofts. Plots near the green face conservation-area control on demolition, side extensions and anything affecting the historic setting.
Typical Northolt housing stock
Northolt centres on the historic Village Green around St Mary's Church and Court Farm Road, but the wider UB5 district is predominantly 1930s semi-detached and interwar suburban housing with good-sized rear gardens.
Streets we regularly draw for in Northolt
Ealing Road · Court Farm Road · Church Road · Islip Manor Road
Building Regulations Drawings for Northolt (UB5) homes: the package and the process
Every building regulations drawings we prepare for an Northolt property is drawn to London Borough of Ealing’s validation standards and tuned to the UB5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Where planning drawings gain design consent, building regulations drawings prove your project meets the technical standards for a safe, warm, structurally sound building. DrawingsDirect produces full-plans building control packages for London extensions, lofts and conversions, with structural calculations produced in-house rather than subcontracted.
What do building regulations drawings cover?
A building control package translates the approved design into a buildable, compliant specification.
- Construction sections and detailed junctions
- Structural drawings and calculations (steel beams, foundations, loadings)
- Part L thermal performance and insulation specification
- Fire safety — escape routes, protected structure, alarms
- Drainage and ventilation layouts
Full Plans or Building Notice — which should I choose?
A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly.
| Factor | Full Plans | Building Notice |
|---|---|---|
| Drawings checked before work starts | Yes | No |
| Up-front certainty | High — approval in writing | Lower — inspected as built |
| Best for | Extensions, lofts, structural work | Minor, simple works |
| Evidence for lenders and buyers | Full approval record | Completion certificate only |
| Risk of costly on-site rework | Low | Higher if issues are found late |
Building Regulations Drawings in Northolt UB5 — FAQs
Do I need building regulations approval as well as planning permission?+
How long does Building Control approval take?+
Can building regulations drawings be done after planning approval?+
Are structural calculations included?+
Can you submit to Building Control for me?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Northolt planning assessment
Tell us your Northolt (UB5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.