
Structural Drawings in Greenford UB6
Fixed-fee, MCIAT-chartered structural drawings for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.
The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.


Planning in Greenford (UB6): what to know before you apply
No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.
Typical Greenford housing stock
Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.
Streets we regularly draw for in Greenford
Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue
Structural Drawings for Greenford (UB6) homes: the package and the process
Every structural drawings we prepare for an Greenford property is drawn to London Borough of Ealing’s validation standards and tuned to the UB6 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Structural drawings and calculations are the technical backbone of almost every London home improvement — removing a wall between a kitchen and dining room, inserting a steel beam (often called an RSJ) to open up a room, digging foundations for a rear extension, or checking that an existing roof and floor can safely carry the extra load of a loft conversion. Building Control will not sign off any of this work without a calculation from a qualified engineer showing the beam, foundation or floor is correctly sized for the loads it carries, and most builders will not order steel or start groundworks without one either.
DrawingsDirect produces and coordinates structural calculations in-house alongside your architectural drawings, rather than treating them as a separate, disconnected step. That matters in practice: it is common for a beam size on a structural calculation to not quite match what is drawn on the architectural plan, which causes delays at Building Control or confusion on site when the builder is ordering steel. Because we draw the architectural set and coordinate the structural calculation together, the beam, padstone and bearing shown on your drawings are the same ones the calculation is based on. Structural drawings are available as a standalone service for a single wall or beam, or bundled into a larger extension, loft or basement building regulations package.
Do I need structural calculations to remove a load-bearing wall in London?
If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.
How steel beam sizing works
A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.
| Project scope | What's included | Fee guide |
|---|---|---|
| Single beam or wall removal | One steel calculation plus a drawing showing beam size, padstones and bearings | From £650 |
| Loft conversion structural package | Floor and roof loading checks, beam calculations, staircase opening design | Included within loft drawings from £1,100 |
| Rear or side extension structural package | Foundation design, steel beam calculations, roof loading checks | Included within planning and building regs packages from £2,200–£3,850 |
| Basement or retaining structure | Underpinning, retaining wall and waterproofing-adjacent structural calculations | Quoted individually — ground conditions vary |
Structural Drawings in Greenford UB6 — FAQs
Do I need a structural engineer to remove a wall in my London home?+
How long do structural calculations take?+
Will the steel beam on my drawings match what my builder orders?+
Can you produce structural drawings without handling my full planning application?+
Do structural calculations need to be submitted to Building Control?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Greenford planning assessment
Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.