
Measured Building Survey in Greenford UB6
Fixed-fee, MCIAT-chartered measured building survey for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.
The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.


Planning in Greenford (UB6): what to know before you apply
No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.
Typical Greenford housing stock
Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.
Streets we regularly draw for in Greenford
Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue
Measured Building Survey for Greenford (UB6) homes: the package and the process
Every measured building survey we prepare for an Greenford property is drawn to London Borough of Ealing’s validation standards and tuned to the UB6 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Every accurate drawing starts with an accurate survey. Before any proposed extension, loft conversion or alteration can be designed, we need to know exactly what already exists — the true dimensions of each room, the position and size of every door and window, floor-to-ceiling heights, wall thicknesses, roof pitches and the exact shape of the plot. A measured building survey captures all of this on site using a laser distance meter, recording existing plans, elevations and sections to millimetre accuracy, rather than relying on old estate agent floor plans, a previous owner's drawings, or rough on-site guesswork.
This matters more than it might seem. A design drawn on top of an inaccurate existing survey can look correct on paper and then not actually fit once a builder is on site — a wall that is 200mm out of position, a ceiling height that is lower than assumed, or a roof pitch that does not match reality can all force a costly redesign mid-build. A fresh, laser-measured survey de-risks that from the outset: the proposed extension, loft conversion or internal alteration is designed against the real dimensions of your home, not an approximation, so what is drawn is what can actually be built.
Why does a planning or building regulations application need a measured survey?
A planning or building regulations application needs to show the existing building accurately alongside the proposed changes, so the council or Building Control can judge the impact of the work against what is actually there. Existing plans, elevations and sections drawn from an accurate measured survey give the borough confidence that the proposal has been designed against real dimensions, and give your builder a reliable set of drawings to price and build from — an application based on inaccurate or assumed dimensions risks queries, delays, or a design that does not translate cleanly on site.
What does a measured building survey capture?
The survey records everything needed to produce accurate existing drawings: internal room dimensions and floor-to-ceiling heights on every level, the position, width and height of every door and window, wall thicknesses, staircase dimensions and headroom, roof shape and pitch, chimney breasts and structural features, and the external footprint and boundary relationship of the property. Where relevant to the project, we also record ground levels, existing drainage runs and neighbouring boundary conditions.
This is captured with a laser distance meter rather than a tape measure, which keeps the survey accurate to within a few millimetres across a whole property and removes the cumulative measuring error that can creep into a hand-measured survey of a larger or more complex building.
| Output drawing | Relies on the measured survey for |
|---|---|
| Floor plans | Accurate room dimensions and layout for sale, letting or lease use |
| Planning drawings | Existing plans, elevations and sections to compare against the proposal |
| Building regulations drawings | Accurate existing structure to design technical compliance against |
| Structural calculations | True spans, floor-to-ceiling heights and existing structural elements |
Measured Building Survey in Greenford UB6 — FAQs
How much does a measured building survey cost?+
How long does a measured survey take?+
Is a measured survey the same as a floor plan?+
Do I need a measured survey if I am only doing internal work?+
Can the survey be used for more than one purpose?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Greenford planning assessment
Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.