MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportStructural Drawings in Kentish Town NW5

Commercial to residential conversion drawings in Kentish Town NW5, London Borough of Camden
Kentish Town · NW5 · Camden

Structural Drawings in Kentish Town NW5

Fixed-fee, MCIAT-chartered structural drawings for Kentish Town (NW5) homeowners — London Borough of Camden validation and local constraints handled from the start.

Free Kentish Town planning assessment

Tell us your Kentish Town (NW5) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Kentish Town (NW5) is predominantly Victorian, with two conservation areas — Dartmouth Park on the rising ground to the north and Inkerman in the streets off Kentish Town Road — and Camden's Article 4 layer over the top. It is a district where the difference between one street and the next genuinely changes the route to consent.

Camden's Basements direction removes permitted development rights for basement works throughout, so lower-ground schemes need a full application. The Class E to C3 direction, in its outside-the-CAZ form, removes the permitted commercial-to-residential change here — which matters along Kentish Town Road and Fortess Road, where the shop-to-flat conversion is a common project and now needs planning rather than prior approval. In the Dartmouth Park and Inkerman conservation areas, frontages and rooflines are controlled, and the rise toward Dartmouth Park Hill means rear extension levels and overlooking are assessed against the slope. We check the boundaries and the Article 4 position for an NW5 address before drawing to Camden's guidance.

Commercial to residential conversion drawings in Kentish Town NW5, London Borough of Camden
Isometric illustration of a Kentish Town NW5 home structural drawings design
Proposed floor plan
Kentish Town NW5

Planning in Kentish Town (NW5): what to know before you apply

NW5 falls under Camden's Basements Article 4 direction, removing permitted development rights for basement works, and the outside-CAZ Class E to C3 direction, which removes the permitted commercial-to-residential change — so shop-to-flat conversions along Kentish Town Road and Fortess Road need full planning applications rather than prior approval. The Dartmouth Park and Inkerman conservation areas control frontages and rooflines, and the rising ground toward Dartmouth Park Hill brings level and overlooking assessments into rear extension design.

Typical Kentish Town housing stock

Victorian terraces through the centre and along Fortess Road, larger Victorian semi-detached and terraced houses climbing Dartmouth Park Hill, and a substantial share of the stock converted to flats.

Streets we regularly draw for in Kentish Town

Kentish Town Road · Fortess Road · Dartmouth Park Hill · Lady Margaret Road

Structural Drawings for Kentish Town (NW5) homes: the package and the process

Every structural drawings we prepare for an Kentish Town property is drawn to London Borough of Camden’s validation standards and tuned to the NW5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Structural drawings and calculations are the technical backbone of almost every London home improvement — removing a wall between a kitchen and dining room, inserting a steel beam (often called an RSJ) to open up a room, digging foundations for a rear extension, or checking that an existing roof and floor can safely carry the extra load of a loft conversion. Building Control will not sign off any of this work without a calculation from a qualified engineer showing the beam, foundation or floor is correctly sized for the loads it carries, and most builders will not order steel or start groundworks without one either.

DrawingsDirect produces and coordinates structural calculations in-house alongside your architectural drawings, rather than treating them as a separate, disconnected step. That matters in practice: it is common for a beam size on a structural calculation to not quite match what is drawn on the architectural plan, which causes delays at Building Control or confusion on site when the builder is ordering steel. Because we draw the architectural set and coordinate the structural calculation together, the beam, padstone and bearing shown on your drawings are the same ones the calculation is based on. Structural drawings are available as a standalone service for a single wall or beam, or bundled into a larger extension, loft or basement building regulations package.

Do I need structural calculations to remove a load-bearing wall in London?

If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.

How steel beam sizing works

A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.

Typical structural drawing scope by project
Project scopeWhat's includedFee guide
Single beam or wall removalOne steel calculation plus a drawing showing beam size, padstones and bearingsFrom £650
Loft conversion structural packageFloor and roof loading checks, beam calculations, staircase opening designIncluded within loft drawings from £1,100
Rear or side extension structural packageFoundation design, steel beam calculations, roof loading checksIncluded within planning and building regs packages from £2,200–£3,850
Basement or retaining structureUnderpinning, retaining wall and waterproofing-adjacent structural calculationsQuoted individually — ground conditions vary
FAQ

Structural Drawings in Kentish Town NW5 — FAQs

Do I need a structural engineer to remove a wall in my London home?+
Yes, if the wall is load-bearing — which most internal walls between a kitchen and reception room are. We coordinate the structural calculation in-house alongside your drawings, so you do not need to find and brief a separate engineer yourself.
How long do structural calculations take?+
Structural drawings are typically ready within about 7 days of instruction, in line with the rest of our drawing packages, and are produced alongside your architectural and building regulations drawings so everything is issued together.
Will the steel beam on my drawings match what my builder orders?+
Yes — because we produce the architectural drawings and coordinate the structural calculation together, the beam size, position and bearings shown on your plans are the ones the calculation specifies, so there is nothing for your builder to reconcile on site.
Can you produce structural drawings without handling my full planning application?+
Yes, a standalone structural calculation is available if you already have architectural drawings and just need a wall or beam calculated and signed off for Building Control.
Do structural calculations need to be submitted to Building Control?+
Yes — a structural calculation is a required part of a Full Plans or Building Notice submission wherever a load-bearing wall, beam or foundation is involved, and Building Control will not approve the work without one.
Do I need planning permission for a rear extension in Camden?+
Frequently, yes. Much of Camden sits within a conservation area or is listed, and near-borough-wide conservation coverage removes permitted development for many external works. On unlisted homes outside a conservation area a rear extension may still qualify, but in Hampstead, Belsize Park and Primrose Hill a full application is usually needed. We confirm the exact constraints for your address before drawing.
What is a Basement Impact Assessment and will I need one in Camden?+
Camden operates one of the most rigorous basement policies in London. Schemes involving a basement or lower-ground extension generally require a Basement Impact Assessment addressing structural stability, drainage and groundwater. If you are considering below-ground space we flag the requirement early and coordinate the assessment so the application is complete when it is submitted.
Can I make changes to a listed building in Camden?+
Often, but listed-building consent is usually required alongside — or instead of — planning permission, and internal as well as external changes can be controlled. Camden has a high density of listed buildings in Hampstead, Bloomsbury and Fitzrovia. We screen listing status for your address first and prepare the heritage-led drawings and justification the council expects.
How long does Camden take to decide an application?+
Camden determines most householder applications within the statutory eight-week period once validated; basement, conservation and listed-building cases can involve additional consultation. We prepare Camden submissions to the council's validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Camden?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Camden approves. A conservation-area rear extension, a basement and a listed-building scheme differ in the evidence required, so we quote once we have seen your project rather than by the hour.
Free Fixed Quote

Get your free Kentish Town planning assessment

Tell us your Kentish Town (NW5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.