
Structural Drawings in Greenwich
Fixed-fee, MCIAT-chartered structural drawings for Greenwich homeowners — Royal Borough of Greenwich validation and local constraints handled from the start.
Greenwich stretches from the Georgian streets of West Greenwich and the Georgian-fringed heath at Blackheath — set against the Maritime Greenwich World Heritage Site — out to the Edwardian villas of Westcombe Park and the interwar and post-war suburbs of Eltham and Kidbrooke. The northern, historic core carries strong conservation and protected-view control, while the outer suburbs and newer riverside development along the Thames offer more generous plots for extensions and lofts. The right route depends heavily on where in the borough you are.
The character shifts street by street. Conservation areas at West Greenwich, Ashburnham Triangle, Blackheath, Westcombe Park, Eltham Park and Woolwich each carry design control over materials, rooflines and front elevations, and the sloping sites around Blackheath and the Greenwich hills shape what an extension can be. Protected views toward the Royal Observatory and across the river, together with Article 4 directions on HMO conversions in parts of the borough, mean the constraints on a heritage-led scheme in the historic core differ sharply from a straightforward suburban addition toward Eltham or Charlton.
We prepare Greenwich planning drawings tuned to the specific area — heritage-led applications around West Greenwich and Blackheath, and simpler extension and loft schemes toward Eltham and Kidbrooke — confirming the World Heritage Site setting and conservation designations for your address first. It is the same council-accepted drawing set an architect would prepare, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the Royal Borough of Greenwich approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the start.


Planning in Greenwich: what to know before you apply
A distinctive Greenwich consideration is the Maritime Greenwich World Heritage Site and its buffer zone, where the council protects townscape and long views toward the Royal Observatory — proposals nearby are assessed against that setting. Conservation-area control in West Greenwich, Blackheath and Westcombe Park, and Article 4 directions on HMO conversions in parts of the borough, also apply. We confirm what affects your address before drawing.
Typical Greenwich housing stock
Georgian and early-Victorian terraces around West Greenwich and Blackheath, Edwardian villas in Westcombe Park, interwar and post-war housing toward Eltham and Kidbrooke, and newer riverside development along the Thames.
Areas we regularly draw for in Greenwich
Greenwich · Blackheath · Westcombe Park · Charlton · Woolwich · Eltham · Kidbrooke
Structural Drawings for Greenwich homes: the package and the process
Every structural drawings we prepare for a Greenwich property is drawn to Royal Borough of Greenwich’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Structural drawings and calculations are the technical backbone of almost every London home improvement — removing a wall between a kitchen and dining room, inserting a steel beam (often called an RSJ) to open up a room, digging foundations for a rear extension, or checking that an existing roof and floor can safely carry the extra load of a loft conversion. Building Control will not sign off any of this work without a calculation from a qualified engineer showing the beam, foundation or floor is correctly sized for the loads it carries, and most builders will not order steel or start groundworks without one either.
DrawingsDirect produces and coordinates structural calculations in-house alongside your architectural drawings, rather than treating them as a separate, disconnected step. That matters in practice: it is common for a beam size on a structural calculation to not quite match what is drawn on the architectural plan, which causes delays at Building Control or confusion on site when the builder is ordering steel. Because we draw the architectural set and coordinate the structural calculation together, the beam, padstone and bearing shown on your drawings are the same ones the calculation is based on. Structural drawings are available as a standalone service for a single wall or beam, or bundled into a larger extension, loft or basement building regulations package.
Do I need structural calculations to remove a load-bearing wall in London?
If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.
How steel beam sizing works
A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.
| Project scope | What's included | Fee guide |
|---|---|---|
| Single beam or wall removal | One steel calculation plus a drawing showing beam size, padstones and bearings | From £650 |
| Loft conversion structural package | Floor and roof loading checks, beam calculations, staircase opening design | Included within loft drawings from £1,100 |
| Rear or side extension structural package | Foundation design, steel beam calculations, roof loading checks | Included within planning and building regs packages from £2,200–£3,850 |
| Basement or retaining structure | Underpinning, retaining wall and waterproofing-adjacent structural calculations | Quoted individually — ground conditions vary |
Structural Drawings in Greenwich — FAQs
Do I need a structural engineer to remove a wall in my London home?+
How long do structural calculations take?+
Will the steel beam on my drawings match what my builder orders?+
Can you produce structural drawings without handling my full planning application?+
Do structural calculations need to be submitted to Building Control?+
Do I need planning permission for an extension in Greenwich?+
How does the Maritime Greenwich World Heritage Site affect my project?+
Can I extend a home in Blackheath or Westcombe Park?+
How long does the Royal Borough of Greenwich take to decide?+
How much do planning drawings cost in Greenwich?+
Get your free Greenwich planning assessment
Tell us your Greenwich address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.