
Planning Permission in Upminster RM14
Fixed-fee, MCIAT-chartered planning permission for Upminster (RM14) homeowners — London Borough of Havering validation and local constraints handled from the start.
Upminster (RM14) runs from a leafy Edwardian and inter-war suburb down to Corbets Tey, a surviving medieval village and one of the three settlements that originally formed Upminster. The Corbets Tey Conservation Area protects that village character, its listed buildings and its countryside-edge setting, so work there faces close conservation-area control.
Across the wider suburb the housing is mostly detached and semi-detached homes on good-sized plots, and rear extensions, side infills, loft conversions and garden rooms are the usual projects. Havering's householder guidance sets clear expectations, and matching them in the drawings is what gets RM14 schemes through first time.


Planning in Upminster (RM14): what to know before you apply
No borough-wide Article 4 direction affects typical RM14 householder work, so many Upminster houses retain permitted development rights for rear and loft projects. The exception is the Corbets Tey Conservation Area, where the village character, listed group and countryside-edge setting mean external changes are controlled and permitted development is curtailed.
Typical Upminster housing stock
The Corbets Tey village group of listed and historic buildings on the edge of open countryside, surrounded by the Edwardian and inter-war detached and semi-detached housing that makes up most of suburban Upminster.
Streets we regularly draw for in Upminster
Corbets Tey Road · Harwood Hall Lane · Ockendon Road · Hall Lane
Planning Permission for Upminster (RM14) homes: the package and the process
Every planning permission we prepare for an Upminster property is drawn to London Borough of Havering’s validation standards and tuned to the RM14 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission in Upminster RM14 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for an extension in Havering?+
How does green-belt land affect my Havering project?+
Can I build a bigger extension because Havering plots are larger?+
How long does Havering Council take to decide?+
How much do planning drawings cost in Havering?+
Get your free Upminster planning assessment
Tell us your Upminster (RM14) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.