
Planning Permission in Coulsdon CR5
Fixed-fee, MCIAT-chartered planning permission for Coulsdon (CR5) homeowners — Croydon Council validation and local constraints handled from the start.
Coulsdon CR5, and Old Coulsdon in particular, pairs an historic village core around Bradmore Green with streets of interwar 1930s semis, where rear and side extensions and loft conversions are the common ways families extend.
The Bradmore Green Conservation Area removes several permitted development rights near the green, so even though Croydon has no Article 4 directions, we check whether a property falls inside that boundary before choosing permitted development over a full application.


Planning in Coulsdon (CR5): what to know before you apply
Coulsdon homes outside the conservation area often retain permitted development for rear extensions and lofts, while those inside Bradmore Green usually need full householder applications to Croydon. Croydon runs no Article 4 directions. We confirm the boundary and roof form before advising a route.
Typical Coulsdon housing stock
The heart of Old Coulsdon around Bradmore Green and Grange Park keeps an older village character, wrapped by the interwar and 1930s semi-detached houses that make up much of the wider CR5 stock, most with side and rear scope for extension.
Streets we regularly draw for in Coulsdon
Coulsdon Road · Bradmore Way · Canons Hill · Fairdene Road
Planning Permission for Coulsdon (CR5) homes: the package and the process
Every planning permission we prepare for an Coulsdon property is drawn to Croydon Council’s validation standards and tuned to the CR5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.
Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |
Planning Permission in Coulsdon CR5 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for an extension in Croydon?+
Can I build a larger extension on a Purley or Sanderstead plot?+
What do Croydon's HMO Article 4 directions mean for me?+
How long does Croydon Council take to decide?+
How much do planning drawings cost in Croydon?+
Get your free Coulsdon planning assessment
Tell us your Coulsdon (CR5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.