
New Build Drawings in Shoreditch EC2A
Fixed-fee, MCIAT-chartered new build drawings for Shoreditch (EC2A) homeowners — London Borough of Hackney validation and local constraints handled from the start.
Shoreditch around EC2A is defined by its former industrial fabric, brick warehouses, workshops and print buildings now reworked as creative lofts, studios and apartments, with the Arts-and-Crafts Boundary Estate nearby. Projects here lean toward change of use, warehouse-to-residential conversion, roof-level and mansard additions and the reconfiguration of loft apartments rather than the suburban rear extension.
The South Shoreditch and Redchurch Street conservation areas protect this warehouse character closely, so visible roof additions and facade alterations are heavily scrutinised. We prepare Shoreditch drawings to the London Borough of Hackney's conservation and change-of-use standards, coordinating planning, fire and building-regulation detail so conversions and roof schemes stand up first time.


Planning in Shoreditch (EC2A): what to know before you apply
No published householder Article 4 direction governs the EC2A part of Shoreditch, but the South Shoreditch conservation area and change-of-use policy mean nearly all warehouse-conversion, mansard and facade work requires full planning permission with detailed heritage and amenity justification.
Typical Shoreditch housing stock
Shoreditch around EC2A is former industrial and warehouse territory, brick workshops, print buildings and factories now converted into creative lofts, studios and flats, alongside the Arts-and-Crafts Boundary Estate. The work here is less about garden extensions and more about change of use, warehouse-to-residential conversion, roof-level additions and internal loft-apartment reconfiguration.
Streets we regularly draw for in Shoreditch
Worship Street · Columbia Road · Barnet Grove · Galway Street
New Build Drawings for Shoreditch (EC2A) homes: the package and the process
Every new build drawings we prepare for an Shoreditch property is drawn to London Borough of Hackney’s validation standards and tuned to the EC2A constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Designing a new dwelling on an infill or backland plot in London is a longer and more technically demanding journey than an extension or loft conversion — it involves establishing whether the plot can support a new home at all, securing full planning permission against a borough's density, design and amenity policies, and then producing a building regulations and structural package detailed enough to actually build from. DrawingsDirect delivers all of this as one coordinated service: feasibility, full planning drawings, building regulations drawings and structural calculations, produced in-house rather than passed between separate architects, engineers and drafters who each need briefing and coordinating separately.
London infill and backland sites bring specific challenges that a straightforward extension does not: the impact of a new dwelling on neighbouring daylight and sunlight, privacy and overlooking, the character and density of the surrounding streetscape, and access, parking and refuse arrangements for a new independent home. Getting an early, honest read on these issues — before a full application is drawn and submitted — is often the difference between a scheme that is approved and one that is refused and has to be reworked. We assess feasibility and, where useful, prepare pre-application advice before committing to a full drawing set.
Is my plot suitable for a new build in London?
A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.
What does pre-application advice add to a new build project?
Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.
| Stage | What it establishes | Typical fee guide |
|---|---|---|
| Feasibility | Whether the plot can support a new dwelling and the likely constraints | Quoted individually, from within the £2,500 new build fee |
| Pre-application advice | Written borough feedback on the scheme before a full application | Quoted individually alongside the planning fee |
| Full planning drawings | The complete drawing set submitted for planning permission | From £2,500 |
| Building regs and structural | Construction-ready drawings and calculations for building | From £2,200–£3,850, quoted once planning is settled |
New Build Drawings in Shoreditch EC2A — FAQs
How much do new build drawings cost in London?+
Can any garden or backland plot be built on in London?+
Do I need pre-application advice before a full new build application?+
Do you handle building regulations and structural drawings for a new build, or only planning?+
How long does a new build project take from feasibility to planning permission?+
Do I need planning permission for an extension in Hackney?+
My Hackney property is a converted flat — can I still extend?+
What does Hackney's borough-wide HMO Article 4 direction cover?+
How long does Hackney Council take to decide?+
How much do planning drawings cost in Hackney?+
Get your free Shoreditch planning assessment
Tell us your Shoreditch (EC2A) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.