Guide

How Much Does a Rear Extension Cost in London? (2026)

What a single-storey rear extension costs in London in 2026 — build cost per sqm, drawing and planning fees, structural, party wall, VAT, and what swings the price.

A single-storey rear extension is the most popular way London homeowners add a kitchen-diner and open up the back of the house to the garden. But the headline build figure is only one line in the budget, and the range is wide because a rear extension on a level Victorian terrace in Croydon is a very different job from a glass-heavy extension over made-up ground in Islington. This guide sets out honest 2026 London market ranges — build cost per square metre, drawings and design, structural, party wall, Building Control and VAT — so you can budget the whole project, not just the brickwork.

The figures below are market-wide London ranges for 2026, drawn from typical residential contract prices, not a DrawingsDirect quote for your specific house. Treat the build cost as the large, variable number and the drawing and approval fees as a smaller, largely fixed number that, done well, keeps the large number under control. We also explain how a rear extension differs from a side-return and a wraparound, because the words are often used loosely and the price per square metre is not the same for each.

How much does a rear extension cost in London in 2026?

In 2026, most single-storey rear extensions in London cost between £2,200 and £3,200 per square metre to build, with a standard-finish job around £2,400–£2,700 and a high-specification one with structural glazing and a fitted kitchen pushing past £3,000. On a typical 20 square metre extension that is roughly £44,000 to £64,000 for the build shell and standard finishes, before the kitchen, the professional fees and VAT are counted. The reason it is a band rather than a single figure is that finish level, glazing, ground conditions and access all move the number, and no two London plots behave the same way.

Layered on top of the build are the professional and statutory costs that many homeowners forget until they arrive. A complete drawing package — planning drawings, building-regulations drawings and structural calculations — typically runs £2,200–£3,850 as a fixed fee. The council's householder planning application fee and the Building Control charge are separate again and paid to those bodies directly. Getting accurate, approvable drawings first is what stops the build number drifting, because a design that sails through planning and Building Control avoids the abortive work and mid-project redesigns that quietly inflate a builder's final account.

What is included in the build cost per square metre?

The per-square-metre rate is a useful shorthand, but it hides a lot of variation. A standard rate covers the structural shell — foundations, walls, a flat or pitched roof, a rooflight or two, plastering, basic electrics and plumbing, and standard doors — but it rarely includes the kitchen, high-end flooring, underfloor heating or a full run of structural glazing. When you compare two builders' rates, the honest question is what sits inside the rate and what has been quietly left out as a provisional sum or a client-supplied item.

It is also worth separating the shell from the fit-out in your own head. The shell is relatively predictable; the fit-out is where personal choices multiply cost. A modest kitchen and porcelain tiles keep you near the bottom of the band, while a bespoke kitchen, bifold or slim-framed sliding doors and a polished-concrete floor lift a 20 square metre room by £20,000 or more on their own.

Structural work and steel beams

Almost every rear extension removes part of the original rear wall to open the new room into the existing house, and that means a steel beam and, on wider openings, a goalpost frame designed and calculated by a structural engineer. Those calculations feed directly into the building-regulations drawings, which is why structural design is a normal line in a complete drawing package rather than an optional extra. Deeper or wider extensions, and any that carry a first floor or a roof terrace above, need heavier steelwork and larger padstones, all of which the engineer sizes and the builder prices from the drawings. Foundation type matters too — a simple strip footing is far cheaper than the deep or piled foundations needed near trees, drains or on shrinkable London clay.

Glazing, roof and kitchen fit-out

Glazing is the single biggest discretionary swing. A modest set of French doors and a rooflight is inexpensive; a full-width run of bifold doors, a slim-framed sliding wall or a structural-glass box changes both the steel design and the price, often adding £10,000–£25,000. The roof choice — a warm flat roof with rooflights versus a pitched or lantern roof — moves the figure again. Then comes the kitchen: because most rear extensions are built to house a new kitchen-diner, the kitchen and appliances are effectively part of the project budget, and they range from around £8,000 for a mid-range fit to well over £40,000 for a bespoke design.

Completed single-storey rear extension with structural glazing and a lantern roof at the back of a London home, showing build cost factors

What swings the price of a London rear extension?

Beyond finish level, four site-specific factors move the total most, and they are largely outside your control. Ground conditions come first: London is riddled with shrinkable clay, mature trees with protected root zones, old drainage runs and the occasional made-up ground, any of which forces deeper, reinforced or piled foundations that a simple trench-fill quote never anticipated. A site investigation before you commit is cheap insurance against a five-figure foundation surprise.

Access is the second lever — a house with no side gate, where every barrow of muck and every pallet of brick must be carried through the hallway, costs more in labour than one with rear vehicle access. The third is the design complexity that the glazing and roof choices above create. The fourth is the borough and the planning route: a conservation area, an Article 4 direction removing permitted-development rights, or a listed building each adds design constraint and evidence, and therefore cost, before a spade goes in the ground.

  • Ground conditions — clay, trees, drains and made-up ground can force deep or piled foundations
  • Access — no side return or rear access means slower, costlier material handling
  • Glazing and roof — structural glass, bifolds and lanterns lift both steel design and price
  • Kitchen and fit-out specification — the largest discretionary line in most rear extensions
  • Planning context — conservation areas, Article 4 directions and listed status add design and evidence work

How is a rear extension different from a side-return or wraparound?

These three terms describe different footprints, and the price per square metre differs because of it. A rear extension projects straight out from the back wall into the garden and is the simplest of the three. A side-return fills the narrow alley of dead space that runs alongside the back room of a typical Victorian or Edwardian terrace — it adds less floor area but transforms the light and width of the existing kitchen, and because it is a fiddly, small-footprint job it often carries a higher rate per square metre. A wraparound combines both, extending to the rear and filling the side return in one L-shaped project, which usually gives the best value per square metre because the setup, roof and structural work are shared across a larger area.

Knowing which you actually want matters for both budget and planning. Many rear and side-return extensions fall within permitted development, avoiding a full planning application, while a large wraparound more often needs full householder planning permission. Getting the drawings and the planning route right at the design stage is what keeps a wraparound from being priced and built as two separate, more expensive jobs.

Does the price include planning, drawings and VAT?

Usually not — and this is where budgets slip. A builder's quote covers construction; it rarely covers the drawings, the structural calculations, the planning application or the statutory Building Control charge. Planning permission and building-regulations approval are two separate consents: planning decides whether you may build the extension, while building regulations govern how it is constructed and are checked by Building Control during the works. You need drawings for both, and a complete package covers planning drawings, building-regs drawings and structural design as one coordinated set that a build can actually be priced and constructed from.

VAT is the final line people underestimate. Almost all domestic extension work is standard-rated at 20%, charged by a VAT-registered builder on labour and materials, and it is not usually recoverable by a homeowner. When you read a market range, check whether it is quoted inclusive or exclusive of VAT, because a figure quoted plus VAT is one-fifth larger than it first appears. A Party Wall Act 1996 award, where the extension sits against or near a neighbour's boundary, is a further cost — the surveyors' fees, usually paid by the building owner, are separate again.

How do I keep a rear extension on budget?

The most reliable saving is made before anyone lifts a tool, in the quality of the drawings and the clarity of the specification. A complete, accurate set of planning and building-regulations drawings, backed by real structural calculations, lets several builders price the exact same job — which turns quotes into true like-for-like comparisons instead of guesses, and removes the variations and provisional sums that inflate a final account. Vague drawings, by contrast, invite every builder to price defensively and then bill the gaps as extras once you are committed.

Fix the specification early, hold a sensible contingency of around 10–15% for the unknowns that live underground, and resist changing your mind once the build starts, because mid-project changes are the most expensive kind. It also pays to settle the planning route before you commission a builder: confirming whether the project is permitted development or needs full householder permission avoids abortive design and lets the drawings be produced once, correctly. Approvable drawings are not a cost to minimise but the tool that keeps the far larger build cost under control.

Typical 2026 London rear extension budget lines (market ranges, excluding VAT)
Cost lineWhat it coversTypical 2026 range
Build — standard finish20 sqm single-storey shell and standard finishes£44,000–£54,000
Build — high specificationStructural glazing, lantern roof, premium finish£54,000–£70,000+
Complete drawing packagePlanning + building-regs drawings + structural£2,200–£3,850
Kitchen and fit-outCabinetry, appliances, flooring, worktops£8,000–£40,000+
Party wall awardSurveyors' fees where a boundary is affected£1,000–£3,000+

Related services: Rear Extension Drawings, House Extension Drawings, Planning Drawings.

FAQ

Frequently asked questions

How much does a single-storey rear extension cost in London in 2026?+
As a market guide, expect £2,200–£3,200 per square metre to build, so a common 20 square metre rear extension is roughly £44,000–£64,000 for the shell and standard finishes. Add the kitchen fit-out, professional fees and VAT on top to reach the true all-in cost.
Do I need planning permission for a rear extension?+
Many single-storey rear extensions fall within permitted development under the GPDO 2015, provided they stay within depth, height and eaves limits and the property has no Article 4 direction removing those rights. In a conservation area or on a listed building the rules tighten, so the property's status should be checked before you assume the permitted-development route.
Is a side-return extension cheaper than a rear extension?+
Not necessarily per square metre. A side-return fills the narrow alley beside the back room and adds less floor area, and because it is a small, fiddly footprint the rate per square metre is often higher than a straightforward rear extension, even though the total spend can be lower simply because the added area is smaller.
Does the build cost include VAT?+
Often it is quoted excluding VAT, so always ask. Almost all domestic extension work is standard-rated at 20%, charged by a VAT-registered builder and not usually recoverable by a homeowner. A range quoted plus VAT is one-fifth larger than it first appears, which is a common reason budgets fall short.
Will I need a party wall agreement for a rear extension?+
Frequently yes. If the extension is built against or near a shared boundary, or its foundations fall within the distances set by the Party Wall Act 1996, you must serve notice on the affected neighbour. Where they dissent, surveyors produce a party wall award, and the building owner usually pays those fees, which are separate from the build price.