MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportBuilding Regulations Drawings in East Dulwich SE22

Kitchen side-return extension in a Victorian terrace in East Dulwich SE22, London Borough of Southwark
East Dulwich · SE22 · Southwark

Building Regulations Drawings in East Dulwich SE22

Fixed-fee, MCIAT-chartered building regulations drawings for East Dulwich (SE22) homeowners — London Borough of Southwark validation and local constraints handled from the start.

Free East Dulwich planning assessment

Tell us your East Dulwich (SE22) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

East Dulwich (SE22) sits in the London Borough of Southwark, tucked between Dulwich Village, Peckham and Forest Hill. Its character comes from the tight grid of late-Victorian and Edwardian terraces — the 'Derbyshire colony' of streets off Lordship Lane, including Melbourne Grove, built in the 1870s and 1880s. Rear, side-return and loft projects on these consistent terraces are the staple here.

The Gardens conservation area lies to the north-east, off East Dulwich Road by Peckham Rye Common, and the Dulwich Village conservation area borders the district to the south, so properties near either boundary answer to heightened design scrutiny. Southwark publishes its Article 4 directions and none covers these householder streets, so many East Dulwich houses keep permitted-development rights — we confirm where an address sits relative to the conservation areas before advising.

Kitchen side-return extension in a Victorian terrace in East Dulwich SE22, London Borough of Southwark
Isometric illustration of a East Dulwich SE22 home building regulations drawings design
Proposed floor plan
East Dulwich SE22

Planning in East Dulwich (SE22): what to know before you apply

Southwark publishes its Article 4 directions and none covers the East Dulwich householder streets, so many houses retain permitted-development rights for rear and loft work. The Gardens conservation area to the north-east and the Dulwich Village conservation area to the south are the controls that matter near those boundaries, and the consistent Victorian and Edwardian terrace frontages mean dormers and elevation changes are judged against the established grain. We check an address against those designations before drawing.

Typical East Dulwich housing stock

Late-Victorian and Edwardian terraces across the 'Derbyshire colony' streets off Lordship Lane — including Melbourne Grove — with grander villas toward Dulwich Village and the houses fronting Peckham Rye.

Streets we regularly draw for in East Dulwich

Lordship Lane · Melbourne Grove · North Cross Road · Barry Road

Building Regulations Drawings for East Dulwich (SE22) homes: the package and the process

Every building regulations drawings we prepare for an East Dulwich property is drawn to London Borough of Southwark’s validation standards and tuned to the SE22 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Where planning drawings gain design consent, building regulations drawings prove your project meets the technical standards for a safe, warm, structurally sound building. DrawingsDirect produces full-plans building control packages for London extensions, lofts and conversions, with structural calculations produced in-house rather than subcontracted.

What do building regulations drawings cover?

A building control package translates the approved design into a buildable, compliant specification.

  • Construction sections and detailed junctions
  • Structural drawings and calculations (steel beams, foundations, loadings)
  • Part L thermal performance and insulation specification
  • Fire safety — escape routes, protected structure, alarms
  • Drainage and ventilation layouts

Full Plans or Building Notice — which should I choose?

A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly.

Full Plans vs Building Notice for a London project
FactorFull PlansBuilding Notice
Drawings checked before work startsYesNo
Up-front certaintyHigh — approval in writingLower — inspected as built
Best forExtensions, lofts, structural workMinor, simple works
Evidence for lenders and buyersFull approval recordCompletion certificate only
Risk of costly on-site reworkLowHigher if issues are found late
FAQ

Building Regulations Drawings in East Dulwich SE22 — FAQs

Do I need building regulations approval as well as planning permission?+
Almost always, yes. Planning permission covers what the building looks like; building regulations cover how safely it is built. Most extensions and loft conversions need both.
How long does Building Control approval take?+
A Full Plans application is typically assessed within about five weeks. We prepare a complete package and respond to any conditions promptly, so approval is not held up by missing detail.
Can building regulations drawings be done after planning approval?+
Yes. Many homeowners secure planning permission first, then commission the building regulations package before starting on site. We can pick a project up at either stage.
Are structural calculations included?+
Yes — we produce structural drawings and calculations in-house as part of the building regulations package, so your builder has everything to price and build.
Can you submit to Building Control for me?+
Yes, we prepare and submit the Full Plans package and respond to any Building Control queries.
Do I need planning permission for an extension in Southwark?+
It depends on the area. On Victorian terraces in Camberwell and Peckham a single-storey rear or side-return extension can fall within permitted development, but conservation areas across Camberwell, Dulwich, Bermondsey and Bankside remove or restrict those rights. We check your address against the designations first and can confirm permitted development with a Lawful Development Certificate where it qualifies.
What is the Dulwich Estate scheme of management?+
It is a distinctive Southwark consideration: many properties on the Dulwich Estate need Dulwich Estate consent in parallel with planning permission, similar in effect to a covenant. It is separate from the council's decision, so both must be satisfied. We flag whether the Estate scheme applies to your property before drawing and design to its requirements as well as the council's.
Can you handle a warehouse or riverside conversion in Bermondsey or Bankside?+
Yes. Southwark's riverside quarters carry their own townscape and taller-building context, and conversions there are assessed against conservation and design control near the Thames. We prepare drawings that respond to that setting and the council's design expectations, confirming the constraints for your specific building before design begins.
How long does Southwark Council take to decide?+
Southwark determines most householder applications within the statutory eight-week period once validated; Dulwich, conservation and riverside cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Southwark?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Southwark approves. A Camberwell terrace extension and a Dulwich Estate application differ in the evidence required, so we quote once we have seen your address and project rather than by the hour.
Free Fixed Quote

Get your free East Dulwich planning assessment

Tell us your East Dulwich (SE22) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.